Wake BRT: Southern Corridor
Wake BRT: Southern Corridor
The Southern Corridor will connect downtown Raleigh and the North South Station in Garner. Help develop the Wake BRT: Southern Corridor project design by taking the brief survey below. This survey will be available from April 26 - May 31, 2021. For more information, including a short video and handout, or to sign-up for updates, visit www.raleighnc.gov/brt-open-house.
Southern Corridor
Home Zip Code
Work/school Zip Code
Do you live or work along the Southern Corridor, within a half mile?
Which type of bicycle and pedestrian path or lane would you most likely use?
The Southern Corridor will provide connections throughout Wake County. Place a pin on the map below where you would travel to using the Southern Corridor and other local transit routes.
This is hidden text that lets us know when google translate runs.