September 2025 Project Update
Most of the construction work for the Barton Springs Bathhouse Rebailitation project is expected to be completed this fall. As with any construction project, schedules are projected as accurately as possible – dates are subject to change due to the nature of construction and weather conditions.
Reminders
-
During construction, Barton Springs Pool remains open. The north entrance to Barton Springs Pool has been relocated to the west end of the bathhouse, near the temporary restroom and shower trailers.
-
The south side entrance to Barton Springs Pool and parking lot at Azie Morton Drive will remain unchanged throughout the construction phase.
-
Pool tickets may be purchased online, on-site with credit cards from ticket kiosks located near the Zilker Cafe, or with cash directly at the Zilker Cafe.
-
Entry for Early Swim (swim at your own risk) is available at the south entrance on Azie Morton Drive, from 5 to 8 a.m., and at the north entrance from 7:30 to 8 a.m.
 
Completed Tasks
- Heating, ventilation and air conditioning (HVAC) flush out complete for improved indoor air quality in lifeguard spaces including office, break room and locker room.
- Interior painting complete.
- Masonry wall patching completed.
Work In Progress
- Testing and adjusting of HVAC system.
- Light control testing and adjustments.
Planned Work
- Security system installation at east and west gates.
- Exhibit displays and transaction desk installation.

Restoration work on the historic rear rotunda entrance is complete.

New east side Spectator Gallery Entrance/Exit gate installed.

Interior restoration of rotunda complete.

Education area aquarium being prepared for installation.
Parking
During the Bathhouse Rehabilitation project, Barton Springs Pool will maintain its regular schedule and remain open to swimmers. However, William Barton Drive, leading to the parking lot adjacent to the Bathhouse, will be closed to public parking and drop-offs during construction. Parking in the other lots at Zilker Park will remain open, with wayfinding signage guiding pedestrians to the north side pool entrance.
Pedestrian access routes through the construction site will be adjusted as work progresses. Public ADA-accessible parking and emergency vehicle access will be available throughout the construction period. The south side pool entry gate and parking lot at Azie Morton will remain unchanged throughout this time.

Bathhouse Renamed
On April 4, 2024, an Austin City Council resolution renamed the Bathhouse at Barton Springs Pool in honor of Joan Means Khabele for her contributions and activism which led to the integration of the pool. To learn more about Joan Means Khabele, please visit Austin Parks and Recreation's blog.
| |
|
|
|
|
|
|
|