Work In Progress
- The installation of plumbing piping and insulation is in progress.
- The installation of new glazed brick walls is ongoing in the men's and women's shower rooms.
- Steel door frame installation continues throughout.
- Restoration and painting of the steel casement windows is nearing completion.
- The installation of an electrical disconnect near the transformer is in progress.
Planned Work
- Insulation of the ductwork.
- Inspection and testing of the mechanical system.
- Pouring concrete roofs for lifeguard office and family restrooms.
.
Figure 1 – Men's west shower floor being prepared for brick paving installation.

Figure 2 – Salvaged brick pavers clean and prepped for re-installation.

Figure 3 – Completion of ductwork installation in the rooms on the east and west sides of the rotunda.

Figure 4 – Ongoing installation of new glazed brick wall in the west men's shower room.

Figure 5 – New glazed brick wall construction ongoing in women’s dressing and shower area.

Reminder:
During the Bathhouse Rehabilitation project, Barton Springs Pool will maintain its regular schedule and remain open to swimmers. However, William Barton Drive, leading to the parking lot adjacent to the Bathhouse, will be closed to public parking and drop-offs during construction. Parking in the other lots at Zilker Park will remain open, with wayfinding signage guiding pedestrians to the north side pool entrance.
Pedestrian access routes through the construction site will be adjusted as work progresses. Public ADA-accessible parking and emergency vehicle access will be available throughout the construction period. The south side pool entry gate and parking lot at Azie Morton will remain unchanged throughout this time.
Bathhouse Renamed:
On April 4, 2024, an Austin City Council resolution renamed the Bathhouse at Barton Springs Pool in honor of Joan Means Khabele for her contributions and activism which led to the integration of the pool.
To learn more about Joan Means Khabele, please visit the Parks and Recreation Department's blogpost.
Stay informed on the rehabilitation project on our project webpage.
Questions or concerns should be directed to:
Paul Mendoza, AIA, Project Manager
Capital Delivery Services
Paul.Mendoza@austintexas.gov
512-974-1272
Ali Petersen, RID, Project Manager
Capital Delivery Services
Alison.Petersen@austintexas.gov
512-974-7830
Ellen Colfax, RA, Project Manager
Parks and Recreation Department
Ellen.Colfax@austintexas.gov
512-974-9472