September 2024

 

Please see the information below for the latest updates on progress, photos, and announcements. Construction is expected to be substantially completed in the Spring of 2025.

 

Please note that as with any construction project, schedules are projected as accurately as possible. All dates are subject to change due to the nature of construction and the weather conditions.

 

Announcements

  • The bathhouse closed for construction on June 6, 2024. As of June 21, 2024, the north entrance to Barton Springs Pool is relocated to the west end of the bathhouse, near the temporary restroom and shower trailers.

  • The south side entrance to Barton Springs Pool and parking lot at Azie Morton Drive will remain unchanged throughout the construction phase.

  • Pool tickets may be purchased online, on-site with credit cards from ticket kiosks located near the Zilker Café, or with cash directly at the Zilker Café. 
  • Entry for Early Swim (swim at your own risk) is available at the south entrance on Azie Morton Drive, from 5:00 am - 8:00 am, and at the north entrance from 7:30 am - 8:00 am.

 

Illustration of project site plan for renovation of Joan Means Khabele Bathhouse.Ilustración del plano del proyecto para la renovación del Casa de Baños Joan Means Khabele.

Current Project Phase: Construction

Completed Tasks

  • Men's Restroom and Dressing Area

    • Plumbing - New water and wastewater lines installed.

    • Electrical - Underground conduit installed.
    • Installation of concrete slab as foundation for brick pavers.
  • Demolition inside Women's Shower and Dressing Court
    • Terrazzo partitions were salvaged for reinstallation.
    • Brick pavers were salvaged for reinstallation.
  • Water quality feature - swales and plantings installed to capture and filter run-off from the Rock Garden parking lot.

Work In Progress

  • Exterior masonry restoration - repointing damaged mortar joints, removing capstone and installing structural reinforcing at the top of the exterior masonry walls, and cleaning the masonry surfaces.

  • Underground electrical work within the Rotunda and Exhibit Areas.

  • Demolition work expected to be completed within a few weeks.

Planned Work

  • Plumbing throughout Women's Shower and Dressing Court.

  • Prep for concrete slab in Rotunda and Exhibit Areas.

 

Before photo shows the Men’s Shower & Dressing Courtyard area prior to concrete foundation installation.

Figure 1 – Men’s Shower & Dressing Courtyard prepped and ready for installation of its concrete foundation.

 

Photo showing the Men’s Shower & Dressing Courtyard area after installation of concrete foundation and brick pavers.

Figure 2 – Men's Shower & Dressing Courtyard after installation of concrete foundation slab for brick pavers was completed.

 

Before photo of Women's Shower & Dressing Court area prior to installation of new plumbing.

Figure 3 – Women's Shower & Dressing Court prepping for new plumbing.


Black and white photo of rotunda of Joan Means Khabele Bathhouse from the 1950s, illustrating the porch canopy with a plaster ceiling and inset lighting.

Figure 4 – Rotunda of Bathhouse in 1950s, note the porch canopy with a plaster ceiling and inset lighting.

 

Current photo of rotunda canopy ceiling showing original wood blocking for plaster ceiling and framing for inset lighting, which will be restored.

Figure 5 - Rotunda canopy ceiling showing original wood blocking for plaster ceiling and framing for inset lighting, which will be restored.

 

Illustration map of construction project area with red highlight denoting construction impact zones and green highlights denoting public parking areas.

 

Reminder:

During the Bathhouse Rehabilitation project, Barton Springs Pool will maintain its regular schedule and remain open to swimmers. However, William Barton Drive, leading to the parking lot adjacent to the Bathhouse, will be closed to public parking and drop-offs during construction. Parking in the other lots at Zilker Park will remain open, with wayfinding signage guiding pedestrians to the north side pool entrance. Pedestrian access routes through the construction site will be adjusted as work progresses. Public ADA-accessible parking and emergency vehicle access will be available throughout the construction period. The south side pool entry gate and parking lot at Azie Morton will remain unchanged throughout this time.

 

During the Austin City Limits Music Festival held October 4-6 and October 11-13, 2024 in Zilker Park:

  • Barton Springs Pool remains open on event days, access via Barton Hills ONLY to entrance at Azie Morton Drive. Parking is allowed only while swimming. At 8 p.m. nightly, ALL roads close for pedestrian safety. Find more info on ACL Music Festival traffic control here.

Bathhouse Renamed

On April 4, 2024, an Austin City Council resolution renamed the Bathhouse at Barton Springs Pool in honor of Joan Means Khabele for her contributions and activism which led to the integration of the pool. 

 

To learn more about Joan Means Khabele, please visit the Parks and Recreation Department's blogpost.

 

For more information on the renaming of the bathhouse, please visit the Barton Springs Renaming Proposal webpage.

 

Stay informed on the rehabilitation project on our project webpage.

 

Questions or concerns should be directed to:

 

Paul Mendoza, AIA, Project Manager

Capital Delivery Services

Paul.Mendoza@austintexas.gov

512-974-1272

 

Ali Petersen, RID, Project Manager

Capital Delivery Services

Alison.Petersen@austintexas.gov

512-974-7830

 

Ellen Colfax, RA, Project Manager

Parks and Recreation Department

Ellen.Colfax@austintexas.gov

512-974-9472

For more information, email CapitalDelivery@AustinTexas.gov

Visit us online at AustinTexas.gov/Bathhouse-Rehab

Share this news on social media
    
Capital Delivery Services logo 300 dpi
Unsubscribe | My Subscriptions
View this email in a browser