Current Projects
Search results for ""
No results found for ""
City of Winchester - Millwood Avenue (Route 17/50/522)
Project survey Benefits The Millwood Avenue project will enhance safety and traffic flow through the corridor. The Millwood Pike – Millwood Avenue projects are designed to accommodate the planned...
Roundabout at Lee Hill School Drive and Old Dominion Parkway
The Virginia Department of Transportation (VDOT) invited public comment between Dec. 18, 2022 and Jan. 28, 2023, on a proposed project to build a mini-roundabout at the Lee Hill School Drive and...
Route 23 turn lane improvements (Wise Co.)
Provide project feedback The Route 23 turn lane/median crossover improvement project will improve safety and how traffic moves on Route 23 by constructing multiple turn lanes and removing two median...
Route 23 turn lane/median crossover improvements (Wise County)
Provide project feedbackThis is a test project page created for training purposes. The format of this project page should be copied and re-used across all VDOT project pages in the Publicinput.com system.NOTE:...
Rockingham County – Route 11 (North Valley Pike) Sidewalk
Project survey Benefits The US Route 11 sidewalk will improve pedestrian safety to those who travel on foot along Route 11 as well as allow for a stream crossing due to culvert improvements.Public...
Past Projects
Rt. 3 and Orange Plank Road Intersection Safety Modification
The Virginia Department of Transportation (VDOT) invited public comment July 28-Aug. 12, 2022, on a proposed project to modify the intersection of Route 3 and Orange Plank Road in Spotsylvania...
Interstate 81 Weyers Cave Truck Climbing Lanes and Exit 235 Improvements
Provide project feedbackThis project adds a third lane to northbound Interstate 81 from mile marker 234.1 to 237.7, and southbound I-81 from mile marker 237.9 to 234.2. The project is primarily in northern...
Interstate 81 Harrisonburg-Area Widening (Exit 243 to Exit 247)
Project survey is closed Benefits The project is one of a series of corridor improvements to I-81. This project improves safety and traffic flow northbound and southbound on Interstate 81 in the Harrisonburg...
Route 83 roundabout at Clintwood (Dickenson County)
Provide project feedback BenefitsDesign is underway to replace the traffic signal at the intersection of Route 83 and Route 607 (Main Street) in the Town of Clintwood with a roundabout. The roundabout...
I-81 Staunton-Area Widening - Exit 221-225
Project survey is closedThe purpose of this project is to address existing and future capacity needs along I-81 northbound and southbound between mile marker 221.45 and 225.6 in Augusta County near Staunton....
I81 Southbound - Strasburg Area Widening
Project survey is closedBenefits The project is one of a series of corridor improvements to I-81. This project improves safety and traffic flow on southbound Interstate 81 in the Strasburg area by providing...
495 Southside Express Lanes Study
The comment period closed on June 21, 2022. Additional comments can be provided through email to [email protected] The Virginia Department of Transportation (VDOT)...
Bowers Hill Interchange Improvements Study
Welcome to the Virginia Department of Transportation’s (VDOT) public hearing on the Recommended Preferred Alternative for the Bowers Hill Interchange Improvements Study Environmental Impact...