Skip Navigation
Frederick County, MD CROSS CONNECTION CONTROL
  • User Menu
    • Sign In
    • Create Account

The project logo CROSS CONNECTION CONTROL

The project logo CROSS CONNECTION CONTROL

The Frederick County Division of Water and Sewer Utilities (DWSU) will hold a virtual public informational meeting on Wednesday, May 18, at 1:00 pm, regarding proposed Cross-Connection Control regulations.  These regulations mostly affect commercial, industrial and non-residential property owners; however, they affect all DWSU water customers.

Please be advised that in accordance with the Code of Maryland Regulations (COMAR 26.04.01.32) the supplier of water is required to prepare and submit for approval a plan for cross-connection control to the Maryland Department of the Environment.  A cross-connection is a point in a plumbing system where it is possible for a nonpotable substance to come into contact with the potable (safe) drinking water supply.  Common examples of cross-connections include a garden hose submerged in a pesticide mixture, a piped connection providing potable feed water to an industrial process, such as a cooling tower, or a submerged outlet of an irrigation system.  Connections to firefighting equipment are other very common cross-connections.  Most cross-connections occur beyond the customer service connection, within residential, commercial, institutional, or industrial plumbing systems.  Cross-connections can be created in existing facilities without the knowledge of the water system managers and operators.  The proposed regulations are designed to greatly reduce the risk of contamination to the public drinking water supply. 

The draft regulations will be discussed at the meeting for its customers, various stakeholders, and other interested parties.  DWSU will provide a brief presentation prior to receiving comments at the public meeting, but no action will be taken at the meeting. 

 

For additional information and to review the draft regulations, please visit the

Frederick County Division of  Water and Sewer Utilities | Frederick County MD - Official Website 

Click on the header tab, "Public Hearings and Meetings"  &

To view the document, click on "Rules and Regulations FY2022 (Cross-connection control) DRAFT 2.1". 

 

MAY 18
MAY 18

CROSS CONNECTION CONTROL
CROSS CONNECTION CONTROL

Wed, May 18 12:55 PM
  • Google
  • Outlook
  • Apple
Participate by phone: 855-925-2801 Meeting code: 7597
  • Press 1 to listen to the meeting
  • Press 2 to record a comment
  • Press 3 to be placed in a muted queue to speak during the meeting  

You must state your name at the beginning of your phone call, message or voicemail for your message or voicemail to be presented during the meeting.

Accessibility and Language Accommodation Request


No files added yet.

Register for this event

We respect your privacy and never post to social media without your permission.
OR

Copy Project

This is hidden text that lets us know when google translate runs.

Share this

Powered by PublicInput | Privacy Policy | Admin Access | Help Center

Participant Information


Loading...