Carolina Pines Avenue - Advanced Design Public Touchpoint

Move Filter by Segment Options
Project Engagement
Views 139
Participants 25
Responses 163
Comments 21
Subscribers 11
Move Toggle Comments Filter by Segment Options
How often do you use the corridor?
48%
Over 20 times per week
22%
1-5 times per week
17%
11-20 times per week
9%
other
4%
6-10 times per week
23 respondents
Move Toggle Comments Filter by Segment Options
How do you use the Carolina Pines Avenue corridor? (check all that apply)
  • 17100%Vehicular
  • 1165%Walk
  • 741%Ride my bike
  • 16%Public transit
17 Respondents
Move Toggle Comments Filter by Segment Options
With the addition of the multi-use path, sidewalk, and boardwalk over Carolina Pines Lake, how often do you think you will walk or ride your bike along the corridor?
27%
1-5 times per week
27%
6-10 times per week
27%
Other
18%
Over 20 times per week
0%
11-20 times per week
22 respondents
Move Toggle Comments Filter by Segment Options
With the consolidation and improvements outlined in the presentation how often will you use public transportation?
86%
Other
9%
1-5 times per week
5%
Over 20 times per week
0%
Others
22 respondents
Move Toggle Comments Filter by Segment Options
This project includes traffic calming features along the corridor. On a scale of 1 to 10 with 1 being the lowest and 10 being the highest please rate how well do you think the measures outlined in the presentation will help slow traffic speeds along the street.
Average 60 / 100
Move Filter by Segment Options
Do you have any comments or concerns about the project design?
Sidewalks are the biggest need and desire. It is difficult (and at times dangerous) to walk our dogs. Long stretches of the corridor do not have much margin for walking, and traffic speeds by frequently.
We look forward to having sidewalks and slower traffic. It will make things much more enjoyable!
Reply2 Agree4 years ago
Disappointed that the Lake Wheeler Road roundabout has been scrapped. Otherwise, looks pretty good. Would love to better understand what impacts to expect for homeowners who have property impacted by permanent easements and temporary construction easements---what will the restrictions be in permanent easement areas? Will trees/flowerbeds in the temporary construction easement space be damaged?
Reply2 Agree4 years ago
There WILL be a roundabout at Lake Wheeler Road, correct?
Reply2 Agree4 years ago
Yes. I am worried about the storm water controls being planned. I watched the video but didn't see detailed information about what will be done. For example, there is currently not a curb or drain near the intersection of Carolina Pines and Batt street. There is a huge wall of water that travels down that hill and onto the Wellington Woods Condo property. There is damage currently from the water flow, which should be remedied as part of this large design project. Can you explain what is being done to address this problem?
Reply1 Agree4 years ago
The sidewalks and multi-use paths will be more important than traffic calming measures, but both will make this area safer for pedestrians. I'm happy to see there is a plan for this. I've always been cautious on Carolina Pines at night because pedestrians are forced to walk on the edge of the road, or trudge through ditches and roadside muck.

I also want to see trashcans along the sidewalks and multi-use paths. This maybe a good opportunity to use those giant underground trash receptacles that didn't work out for downtown. The litter problem near Carolina Pines and South Saunders is out of control. A "swat-a-litter bug" surveillance camera (on a light post or 2) could help curb some of this. You could fine the drivers who toss their fast food containers out the window, or drop illegally dumped items (old furniture and trash) out in the big field.
Reply1 Agree4 years ago
Move Toggle Comments Filter by Segment Options
How did you hear about the Carolina Pines Avenue online Touchpoint? (Check all the apply)
  • 857%Postcard
  • 429%Area CAC meetings
  • 321%Signs
  • 321%Friends & neighbors
  • 214%Social Media
  • 214%Other
14 Respondents
Move Toggle Comments Filter by Segment Options
On a scale of 1 to 10 with 1 being the lowest and 10 being the highest please rate how informative you found the online Touchpoint.
Average 67 / 100
Move Filter by Segment Options
Do you have any suggestions on how we could improve communication of project details in a virtual format?
Great job.
ReplyAgree4 years ago
Yes - currently the link at the top of this survey isn't working:
https://raleighnc.gov/node/37996/latest

(404 error)
ReplyAgree4 years ago
Thanks for letting us know. The link has been fixed.
4 years ago