Question title

Do you feel the first draft of the manual is clear enough to help you with your project? Please explain why or why not.

Yes
Maybe
No
N/A
Closed to responses

Question title

How comfortable would you feel using the design manual for a development project?

Move the blue dot left or right to indicate your answer.

Loading question...

For this next section: Enter individual feedback in the comment box for each chapter and then press 'comment' to submit that information. To leave multiple comments on a chapter - type another response in the same box then press 'comment' each time you have a comment. This will help us organize and address your comments.

Question title

Please provide comments on Chapter 1 - Introduction.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 2 - Site Development Requirements.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 3 - Hydrology.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 4 - Hydraulics.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 5 - Stormwater Management Design.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 6 - Erosion and Sediment Control.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 7 - Floodplain Management.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on Chapter 8 - Stormwater Utility Fee Credits.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide comments on all checklists and sample plans in the manual.

Please share input on: clarity, quality, overall usability, content that you think should have been included, any other comments on this section.

Closed for Comments

Question title

Please provide your contact information (optional).

Thank you for providing feedback! This information will help us update the manual. We'll let you know as soon as the manual is finished. 

Manual Highlights

Chapter 1

  • Definitions
  • Site planning for stormwater management

Chapter 2

  • Small/large site development
  • Required reference materials
  • Lot grading plans
  • Stormwater development analysis
  • Designer's letter
  • Downstream assessment
  • Easements

Chapter 3

  • Hydrologic design policies
  • Time of concentration
  • Rational method
  • Modified rational method
  • SCS Unit Hydrograph method
  • Closed conveyance system design criteria
  • Inlet and spread criteria
  • Pipe material and cover criteria
  • Open channel design criteria
  • Bridge and culvert design criteria
  • Outlet design
  • Certifications and as-builts
  • Rate of runoff control requirements
  • Water quality requirements
  • Stormwater control measures design criteria
  • Certifications and as-builts
  • Stormwater control measures operations, maintenance, and easements

Chapter 6 

  • Design criteria and guidelines
  • Practice standards
  • Application requirements
  • Construction phasing and sequencing
  • Groundcover vs. stabilization
  • Single-family residential construction
  • Compacted pervious areas
  • Post-construction stormwater devices
  • Special flood hazard areas
  • Floodplain development requirements
  • Permit applications
  • Flood study requirements
  • Elevation certificate process
  • Floodproofing certificate
  • Substantial improvement or damage
  • Stormwater fee credits
  • Applying for credits
  • Credit maintenance and enforcement
  • Appeals and adjustments

View all checklists and sample plans for the manual.