Stormwater Design Manual Comments - Draft Two
Stormwater Design Manual Comments - Draft Two
We are in the process of updating our stormwater design manual, which you use to complete development projects. We'd like your feedback on the changes that we've made based on input that you provided on the first draft.
Please share your thoughts on each chapter including different chapter topics and relevant checklists and sample plans. Your comments will be used to develop a final version of the manual.
Instructions
1. Review chapter highlights in the right sidebar.
2. Please provide comments on chapters you have reviewed. You may comment on as many chapters/topics as you would like.
3. Click 'Finish Survey' after you've provided all of your comments.
Comment period closes September 29.
For this next section: Enter individual feedback in the comment box for each chapter and then press 'comment' to submit that information. To leave multiple comments on a chapter - type another response in the same box then press 'comment' each time you have a comment. This will help us organize and address your comments.
Thank you for providing feedback! This information will help us update the manual. We'll let you know as soon as the manual is finished.
Manual Highlights
- Definitions
- Site planning for stormwater management
- Small/large site development
- Required reference materials
- Lot grading plans
- Stormwater development analysis
- Designer's letter
- Downstream assessment
- Easements
- Hydrologic design policies
- Time of concentration
- Rational method
- Modified rational method
- SCS Unit Hydrograph method
- Closed conveyance system design criteria
- Inlet and spread criteria
- Pipe material and cover criteria
- Open channel design criteria
- Bridge and culvert design criteria
- Outlet design
- Certifications and as-builts
- Rate of runoff control requirements
- Water quality requirements
- Stormwater control measures design criteria
- Certifications and as-builts
- Stormwater control measures operations, maintenance, and easements
- Design criteria and guidelines
- Practice standards
- Application requirements
- Construction phasing and sequencing
- Groundcover vs. stabilization
- Single-family residential construction
- Compacted pervious areas
- Post-construction stormwater devices
- Special flood hazard areas
- Floodplain development requirements
- Permit applications
- Flood study requirements
- Elevation certificate process
- Floodproofing certificate
- Substantial improvement or damage
View all checklists and sample plans for the manual.