Construction is expected to start in 2026 or 2027

This is a resurfacing project. Contractors will replace the road and upgrade what is listed below:

  • Replace the existing road surface with new layers of asphalt.
  • Install a roundabout at the 3 Mile and Coit intersection.
  • Remove the bicycle lanes from the street to narrow the street.
  • Install a new shared use pathway on the north side of the street. This work will require removal of trees and landscaping. The pathway will be installed on City property.
  • Upgrade existing sidewalks and curb ramps to meet the American with Disabilities Act standards.
  • Replace most driveway approaches.
  • Plant new street trees.
  • Install tree wells to help capture stormwater.

 

Project Limits 

Have a question?

Contact Us 

communityengagement@grcity.us

311 or 616-456-3000

Timeline

complete
complete
Monday, April 4, 2025: Concept Design Meeting

At this meeting we will share the project design. 

planned
planned
TBD: Construction Preparation Meeting

 

 

planned
planned
Start Date 2026 or 2027

 

 

planned
planned
TBD: Construction Ends