Comprehensive Transportation Plan
Comprehensive Transportation Plan
The Comprehensive Transportation Plan Long range, needs-based plan; representing consensus by the community and the State on the future transportation system (including the existing system and improvements) needed to support anticipated growth and development over approximately a 25–30-year timeframe.
Comprehensive Transportation Plans are required by North Carolina Legislature (NC General Statute 136-66.2) and are jointly adopted by the North Carolina Department of Transportation and the Triangle West Transportation Planning Organization. Additionally, the Comprehensive Transportation Plan
- is multimodal and includes highways, public transit, rail, bicycle, and pedestrian infrastructure
- identifies all known transportation needs and is not fiscally constrained
- does not include final design but informs final designs in short term planning efforts like the STIP
This project is designed as a central outreach and engagement hub for the Comprehensive Transportation Plan and amendments.
Triangle Bikeway CTP Amendment
The Triangle West Transportation Planning Organization (Triangle West TPO) proposes to amend the Comprehensive Transportation Plan (CTP) to add the Triangle Bikeway alignment and replace or modify several...
Contact
Monet Moore, Triangle West TPO | Monet.Moore@twtpo.org | (919)503-4116
Julie Bogle, NCDOT | JEBogle@ncdot.gov | (919)707-0945