A public workshop for both Milton SR 16 Corridor Study and the Milton Active Transportation Plan was held June 4, 2024 from 5-7 pm at the Milton Elementary School. Further details can be found here.

  • The open house boards are linked as follows:
  • Additional open house boards providing background on the study and the Milton Active Transportation Plan (ATP) (also in progress) can be found on the ATP site
  • A recording presenting the open house boards is available here. The survey that was held between June 4 and July 5, 2024 is now closed. A summary of the results will be made available here at a later date. 
  • Please share this site with others. Thank you!

Project Contact Information

DelDOT Project Manager: Austin Gray

Email: miltonsr16@publicinput.com

Phone: 855-925-2801

Phone Code (when prompted): 6116

Project Timeline

live
live

June 4 - Open House (with Milton Active Transportation Plan)

Spring to Summer 2024 - Existing Conditions Data Collection, Phase I

Fall 2024 -  Public Workshop 2

Late 2024 - Complete Data Collection, Phase II

Spring 2025 - Public Review and Comment Period for Draft Report