We have recently completed a preliminary engineering report (PER) which investigated 13 potential solutions to reduce the impacts of flooding for the neighborhood.  We've narrowed down these solutions from 13 to 2 based on their effectiveness in reducing flood risk, impacts to the environment, and the potential short term and long-term impacts to the neighborhood.

We want to hear your thoughts about the project and the two potential solutions. Please review the information included in the factsheet linked in the "Document Section" on the right side of this webpage and then take our survey below. If you have questions please contact one of the project leaders listed below. You can also find more information at www.austintexas.gov/pacesmill .

Henry Price, PE, WPD,  

(512)-974-1275 

  

J. Eduardo Perez, EIT, WPD,  

(512) 974-2060 

 

Frederick Reza, PM, WPD,  

To the best of your knowledge do you live near the project area? Generally along Paces Mill Lane, Tupelo Drive, and Tara Drive.

Pace s Mill Map
Yes
100%
No
0%
Not sure
0%
Closed to responses | 20 Responses

We want to be sure we're hearing from people who live in the project area. To help with this please provide us with your street name.

Closed to responses

What concerns do you have about the structural solution referred to as Channel Improvements? Choose as many as apply.

Channel Improvements

For the structural solution referred to as Channel Improvements, the City would improve the existing drainage infrastructure in the neighborhood through a construction project. The City would work with a local engineering consultant to develop construction plans and specifications for the project. After the completion of the plans and specifications, the City would hire a contractor through a bidding process to construct the project. Construction activities would be managed and inspected by City staff to ensure constructed infrastructure meets required standards and community needs.

-Removes flood risk to all 15 homes

-Increases capacity of existing channel

-Promotes ecological diversity

-Impacts large, established trees in project area

-Street flooding may continue to be an issue on Paces Mill Ln

-May take 2 years before construction begins

-Note: Referred to as Hybrid Channel option in preliminary engineering report

I'm concerned about continued street flooding on Paces Mill Lane
60%
I have no concerns and I support the Channel Improvements option
47%
I'm concerned about the length of the project construction timeline
27%
I'm concerned this project will harm large trees on or near my property or my neighbor's
20%
I'm concerned this project will increase the amount of water the channel can hold
20%
Other
0%
Closed to responses | 15 Responses

Do you have other thoughts about the Channel Improvements option?

Closed for Comments

What concerns do you have about the Optional Buyouts solution?

What concerns do you have about the Optional Buyouts solution?

The City purchases homes when other structural or maintenance solutions are infeasible, ineffective, or unjustifiably costly. Offers would be for the fair market value of the house as determined by an independent appraisal and would be optional.

• Quickest solution – 1 year timeframe for 1st round of offers

• Flood risk is eliminated completely for the resident/owner/City

• This solution only helps residents that accept the buyout offer

• Structures purchased would be demolished and converted to parkland

I'm concerned about changing the look and feel of my neighborhood
73%
I'm concerned that the City won't make fair offers for buyouts
60%
I'm concerned about having more parkland near my neighborhood
40%
I have no concerns and I support the buyout option
13%
Other
13%
Closed to responses | 15 Responses

Do you have any other thoughts about the Optional Buyouts solution?

Closed for Comments

If your house was selected as a candidate for an Optional Buyout program would you accept a fair market offer from the City of Austin to purchase your home?

No
65%
I'm not sure
24%
Yes
12%
Closed to responses | 17 Responses

After learning about the two potential solutions, Optional Buyouts and Channel Improvements, which one do you prefer?

Channel Improvements
78%
Optional Buyouts
11%
I don't have enough information to decide
11%
Both
0%
Neither
0%
Closed to responses | 18 Responses

If you have any other comments about the project or the project goals, please share them here:

Closed for Comments

If you would like to be added to an email distribution list for this project, please provide your email address: