Call for contractors
Call for contractors
Kiewit Corporation is soliciting prospective contractors to bid on Omaha streetcar bid packages.
Call for Contractors
Kiewit Corporation is soliciting prospective contractors to bid on Omaha streetcar bid packages. Bids are due April 25, 2025, at 5:00 p.m. CDT.
Click here to access the free web-based bidding platform to find plans, specifications and instructions for bidding.
The Omaha streetcar will connect downtown and midtown Omaha via Farnam and Harney streets, from 39th Street to 8th Street.
The project scope includes:
- 5 miles of starter streetcar build, 3.2 miles of track system
- 16 proposed stations
- Concrete Replacement
- New Storm Sewer Pipe
- Storm Sewer Pipe to Removed
- Ductbank Excavation
- 41 Signalized Intersections
- 3 Traction Power Substations
Omaha Streetcar Bid Packages:
- Asphalt Milling
- Traffic Control Flagging
- Striping/Pavement Markings
- Street Sweeping
- Concrete Paving
- Concrete Flatwork
- Concrete Pumping
- Trucking
- Potholing
- CCTV/Pipe Cleaning
- 10th Street Bridge Rehab
- OCS, Streetlight, and TPSS Drilled Foundations
- Rail Flash Butt Welding
- Rail Testing
- Station Handrail
- Station Concrete Acid Wash
- Track Saw and Seal
- Station Amenities
- Reinforcing Steel
- Landscaping
- Demo Sawcutting
- Erosion Control
- Fencing
- Vibration Monitoring and Site Survey
- Traffic Signal Removal and Installation
This is hidden text that lets us know when google translate runs.