Pohick Road Pedestrian Improvements
Pohick Road Pedestrian Improvements
The Pohick Road Pedestrian Improvements project (Project No. 1400171-25) is intended to enhance pedestrian connectivity and safety along the Pohick Road corridor between Route 1 and the I-95 Bridge.
Proposed improvements include:
- Construction of a 10-foot-wide asphalt walkway with a minimum 4-foot buffer on the south/west side of Pohick Road between Larne Lane and Lorton Station Boulevard.
- Relocation of the pedestrian signal crossing at the south leg of the Lorton Station Boulevard intersection to improve connectivity across the corridor.
- Construction of a 7-foot-wide concrete walkway with at least a 4-foot buffer on the east/north side of Pohick Road between Lorton Station Boulevard and the I-95 Bridge.
- Installation of curb and gutter where appropriate throughout the corridor.
For more details on the project, please visit: https://www.fairfaxcounty.gov/transportation/projects/pohick-road-pedestrian-project
FCDOT is seeking feedback on the Pohick Road pedestrian improvement project through June 10, 2026. Thank you for submitting comments via the survey below, or you may leave a recorded voice mail at 703-890-5898, Project Code 6840.