State Route 156 West Corridor Project

State Route 156 West Corridor Project

Any text placed in the Project Description box will be shown at the top of each tab.

This project template serves to help Public Input user to get started on creating a project. This template should be used throughout all TAMC projects created in PublicInput, so that the public interface can remain consistent throughout all projects for easy navgiation. Before moving on to edit this tempalte for your project, please consider the following:

  • When a project is created, it should remain in draft mode until it is complete and ready to be published. Once it is ready to be published, the "Live" mode can be selected.
  • The content boxes are to be filled to keep project sites consistent. The user can add more content such as videos, meetings, or additional surveys if they wish to. See below for an example.

 Spanish / Español | Tagalog (Filipino) / Tagalog

Overview

The State Route 156 West Corridor Project is a comprehensive effort to improve safety, mobility, and freight efficiency along State Route 156 in northern Monterey County. This corridor is a critical east-west route connecting State Route 1 and US 101, serving as a major artery for agricultural freight, tourism, and local commuters. The project is divided into three segments:

Segment 1: Castroville Boulevard Interchange

The State Route 156 / Castroville Boulevard Interchange is the first phase of the corridor project. This segment will replace the existing signalized intersection at State Route 156 and Castroville Boulevard with a grade-separated interchange.

Key Features: 

  • Three modern roundabouts

  • One mile of Class I bike/multiuse path

  • Americans with Disabilities Act (ADA)-compliant pedestrian refuge islands and crosswalks

  • Improved connectivity to the Castroville bike/pedestrian bridge

  • Enhanced access to North Monterey County High School and affordable housing developments

The project is fully funded and scheduled to begin construction in Fall 2026.

Project Benefits

Improves safety at a high-collision location 
Reduces congestion and greenhouse gas emissions 
Enhances freight reliability and access to US 101 
Connects affordable housing, schools, and jobs 
Supports tourism and economic development 

Segment 2: SR 156 Expressway Conversion

Segment 2 is envisioned to convert State Route 156 into a four-lane expressway between Castroville Boulevard and US 101. 

This includes:

  • Transitioning the existing State Route 156 into a frontage road for local circulation

  • Adding bike lanes and multimodal infrastructure

  • Improving traffic flow and safety for freight and passenger vehicles

Segment 3: US 101/SR 156 Interchange Reconstruction

Segment 3 involves a complete redesign of the US 101/State Route 156 interchange, including:

  • A direct flyover connection from eastbound State Route 156 to northbound US 101

  • A modified partial-cloverleaf interchange

  • A new frontage road system to improve local access and circulation