Errata Publication - February 7, 2023

Based on comments received on the Environmental Study Report (ESR), an Errata documenting textual revisions to the report has been appended and published on February 7, 2023. The Errata is to be read in conjunction with the ESR first published on October 6, 2022. The Errata and corresponding ESR and Appendices can be found in the 'Documents' section along the right sidebar of this page.

Notice of Study Completion

The Town of Bradford West Gwillimbury has completed the Schedule ‘C’ Municipal Class Environmental Assessment (MCEA) Study for Holland Street East and West. The Study area extends from Professor Day / Melbourne Drive, east to Dissette Street / Marshview Boulevard (refer to Study area map below). As per the Municipal Class Environmental Assessment process for Schedule ‘C’ projects, the final Environmental Study Report (ESR) has been made public for its required 30 calendar-day public review period, beginning on October 6, 2022, and ending on November 6, 2022. You can find the Notice of Study Completion, the ESR and its corresponding appendices in the 'Documents' section along the right sidebar of this page.

About this Study

The purpose of the Study is to transform Holland Street to align with the Town’s Strategic Plan, which includes: promoting employment growth; improving community and traffic safety; reducing congestion; and upgrading existing facilities. This Study is a key component in revitalizing the Town’s downtown core and transforming it into an inviting, walkable, people-friendly shopping district that will serve as a destination location for residents and visitors to enjoy.

What is a Schedule C Municipal Class Environmental Assessment?

The Holland Street East and West EA was completed in accordance with the Schedule ‘C’ process identified by the Municipal Engineers Association, adhering to the requirements of Phases 1 through 4 of the Municipal Class Environmental Assessment. Through this process, the study team has: confirmed the needs, problems, and/or opportunities; evaluated alternative designs; selected a preferred design; examined impacts on the social, cultural, and natural environments; and identified measures to mitigate those impacts..  

This Study was carried out concurrently with the Town’s Transportation Master Plan (TMP) Study, which developed a guide for the sustainable, efficient, and safe movement of goods and people within and around the Town. The TMP also identified transportation infrastructure requirements and multi-modal network recommendations. The TMP and this MCEA Study represent a fully integrated approach to transportation planning for the study area.

Public Information Center Meeting #2

Public Information Center (PIC) #2 was held on April 28, 2022. PIC #2 was held to solicit feedback on the assessment of planning solutions, the recommended planning solution, the design alternatives, the evaluation of design alternatives, and the technically preferred alternative. If you were unable to participate in the live meeting, you may view the presentation materials under the Document Section in the right column of this webpage. The meeting recordings are posted below. 

Our survey is now closed! Keep an eye out for future engagement opportunities! 

Public Information Center #2 - Session 1 (6:00 PM - 7:00 PM) 

Public Information Center #2 - Session 2 (7:30 PM - 8:30 PM) 

Public Information Center Meeting #1 

Public Information Center (PIC) #1 was held on February 17, 2022. PIC #1 introduced the Study and present the problem/opportunity statement, project timelines, existing conditions, potential site ideas, and other studies included in the EA process. If you were unable to participate in the live meeting, you may view the presentation materials under the Document Section in the right column of this webpage. The meeting recordings are posted below. 

Our survey is now closed! Keep an eye out for future engagement opportunities! 

Public Information Center Meeting #1 - Session 1 (6:00 PM - 7:00 PM) Recording

Public Information Center Meeting #1 - Session 2 (7:30 PM - 8:30 PM) Recording

The presentation (in PDF format) can be downloaded from the Document Section in the right column of this webpage. 

Frequently Asked Questions

complete
complete
Study Initiation

December 2021

complete
complete
Public Information Centre #1

February 17, 2022

complete
complete
Public Information Centre #2

April 28, 2022

live
live
Study Completion

(Council - June 14, 2022) 

October 6, 2022 - An Environmental Study Report (ESR) has been placed for public review for 30-days. The ESR documents the EA Study and process.

November 6, 2022 - End of Review Period.

Documents

1-HollandEA-Notice of Commencement and Public Information Centre #1.pdf 2-HollandEA-Public Information Center #1 Presentation.pdf 3-HollandEA-Notice of Public Information Centre #2.pdf 4-HollandEA-Public Information Center #2 Presentation.pdf 5-HollandEA-Geotechnical Borehole Works Notice.pdf 6-HollandEA-Notice of Study Completion.pdf 7-HollandEA-Environmental Study Report (ESR).pdf 8-HollandEA-Environmental Study Report (ESR) Errata.pdf ESR Appendix A Cultural Heritage Report.pdf ESR Appendix B Stage 1 Archaeology Assessment.pdf ESR Appendix C Natural Environment Report.pdf ESR Appendix D Arborist Report Tree Preservation Plans - TP1 to TP-3.pdf ESR Appendix D Arborist Report.pdf ESR Appendix E Traffic Analysis Report.pdf ESR Appendix F Road Safety Review (Phase 1).pdf ESR Appendix G Road Safety Review (Phase 2).pdf ESR Appendix H Drainage and Stormwater Management Report Appendices.pdf ESR Appendix H Drainage and Stormwater Management Report.pdf ESR Appendix I Detailed Assessment and Evaluation Tables.pdf ESR Appendix J Preliminary Design Plates.pdf ESR Appendix K Streetscape Concept.pdf ESR Appendix L Electrical Memo Roll Plan.pdf ESR Appendix L Electrical Memo.pdf ESR Appendix M Utilities Plan.pdf ESR Appendix N Geotechnical Final Report Appendices.pdf ESR Appendix N Geotechnical Final Report.pdf ESR Appendix O PIC 1 Summary Report.pdf ESR Appendix P PIC 2 Summary Report.pdf ESR Appendix Q Noise Assessment Report.pdf ESR Appendix R Air Quality Report.pdf ESR Appendix S Phase One Environmental Site Assessment.pdf ESR Appendix S Phase One ESA Appendices.pdf ESR Appendix T Fluvial Geomorphology Assessment.pdf ESR Appendix U Soil Characterization Report.pdf ESR Appendix V Hydrogeology Assessment.pdf ESR Appendix V Hydrogeology Report Appendices.pdf

Contact

Marcio Marques, P.Eng
Project Manager, Capital Projects
Town of Bradford West Gwillimbury
305 Barrie Street - Unit 2, Bradford, ON
​905-775-5366 Ext. 2114

Click to Email

Stay Informed!

*By submitting your details, you consent to be contacted by email by the Town of Bradford West Gwillimbury with information regarding the Holland Street EA. You may unsubscribe at any time by sending an email to [email protected] with UNSUBSCRIBE in the subject line.