Overview of the Project

Baltimore Metropolitan Council (BMC), on behalf of the Baltimore Regional Transportation Board (BRTB) and Harford County, is developing a Concept Plan for Bicycle and Pedestrian Improvements along US 40 from the City of Aberdeen to the City of Havre de Grace.  

The concept plan will examine an approximately 5 mile segment of US 40 (Pulaski Highway) in Harford County, Maryland between the train station in the City of Aberdeen and Erie Street in the City of Havre de Grace. This project is located approximately 30 miles north of Baltimore and 20 miles south of Elkton, MD. The corridor serves a diverse traffic mix including local traffic in the Aberdeen/Havre de Grace area, long-distance commuter traffic destined for downtown Baltimore, regional traffic destined for Elkton and freight traffic. The roadway is a divided four-lane principal urban arterial with speed limits varying between 30 and 55 miles per hour and carries over 30,000 vehicles a day.  

Goals of the Project 

  • Develop a concept level design of an asphalt shared-use path along US 40 that is comfortable, convenient, and safe to create a low-stress multi-modal connector to transit and neighborhoods
  • Outline strategies for wayfinding 
  • Develop an implementation and maintenance strategy

This concept plan will be used to develop future phases of design/construction and may be used to guide design standards for future development along the corridor. 

Exploring Alternative Options

As part of the process to develop this Concept Plan for Bicycle and Pedestrian Improvements along US 40, three potential concept options have been developed. These are the Westbound Option, the Eastbound Option, and the Combined Option, which can be viewed in the map below.

The proposed shared-use path for all options would be asphalt, 10 feet in width (8 foot minimum where necessary due to constraints), and include a grass buffer between the shared-use path and edge travel lane.

Click continue below or on the tabs above to learn more. 

Options for Concept Plan for Bicycle and Pedestrian Improvements along US 40 (Aberdeen to Havre de Grace)

Concept Plan for Bicycle and Pedestrian Improvements along US 40 (Aberdeen to Havre de Grace)

complete
complete
Summer 2022 - Project Launch

Analyze existing conditions, develop preliminary alignments and review with project Steering and Advisory Committees.

complete
complete
Fall 2022 - Soliciting Public Input

BMC will solicit public comments on the alternative concepts at a virtual public meeting on November 2 and during a public comment period.

live
live
Fall 2022 - Review and Revise

Following the public comment period, all comments will be considered by the project team and a preferred concept will be developed based on feedback.

planned
planned
Winter 2023 - Soliciting Public Comments

BMC will solicit public comments on the preferred concept at an in-person public meeting and during a public comment period.