STUDY AREA MAP

 

INTERACTIVE STUDY AREA MAP

 

 

* This map for general information only.  

 

 

The study area is a geographical area in which information on Human and Natural Environmental features are gathered during the preliminary planning process. 

Project Status

NCDOT is evaulating various alternatives to improve safety along the NCRR corridor from just north of Glover Road to T.W. Alexander Drive in Durham County.  The project is included in the 2018-2027 State Transportation Improvement Program (STIP) as Project Number P-5706.

The project consists of the following components.

  • Closure of the at-grade railroad crossings at Glover Road, Wrenn Road, and Ellis Road
  • Construction of a new overpass carrying Glover Road over the NCRR corridor and Angier Avenue
  • Construction of additional roadway improvements to insure connectivity to the existing roadway network
  • Construction of a railroad siding adjacent to the existing tracks along the NCRR corridor to enable trains to pass each other

Project History

The Durham Traffic Separation Study (TSS) was initiated in 2011 to evaluate traffic patterns and collect railroad crossing information along the NCRR Corridor from Neal Road in west Durham to Cornwallis Road in Research Triangle Park.  The goal of the study was to identify interim and long-term improvements to enhance safety at the crossings. A series of public meetings was conducted between November 2011 and November 2013 to solicit input from the public and gather feedback on the recommended improvements.  The study was concluded in March 2014.

The study recommended the closure of the Glover Road, Ellis Road, and Wrenn Road railroad crossings.  The study also recommended constructing bridges at Glover and Ellis Roads to separate vehicular traffic from train traffic.

A copy of the study is available here.

The project is listed as Project P-5706 in the 2018-2027 STIP and is funded for $49,280,000


ESTIMATED COSTS

  Activity        Estimated Cost*
  Project Development and Design  $    1,000,000 
  Right of Way Acquisition$    9,000,000 
  Construction Costs  $   42,400,000
  Total Cost$   52,400,000

                                                     

* Estimated Costs as shown in Current 2018-2027 STIP and are subject to change

TIMELINE

  Activity        Estimated Cost*
  Environmental DocumentWinter 2019
  Right of Way Acquisition2023
  Construction2026

                                                     

* Future dates subject to change

PROJECT CONTACT INFORMATION

 

Undrea MajorRyan White, PE
Senior Rail Project Development Engineer ConsultantSenior Transporation Engineer (Consultant)
Rail Division - Planning and Development BranchStantec Consulting Services, Inc
1553 Mail Service Center801 Jones Franklin Road Ste 300
Raleigh, NC  27699-1553 Raleigh, NC  27606
ujmajor@ncdot.gov ryan.white@stantec.com

 

Question title

Please place a pin on the area in which you live.

Question title

Would you like to be added to our mailing list?

Question title

Are there questions you would like to ask the project team?

Question title

Are there comments or information you would like to share with the team?