Seward Highway Rehabilitation: Trail River to Sterling Wye (Milepost 25.5 to 36)
Seward Highway Rehabilitation: Trail River to Sterling Wye (Milepost 25.5 to 36)
The Seward Highway MP 25.5 to 36 Rehabilitation project is considered a “3R” project; it will resurface, restore, and rehabilitate the corridor, and by doing so improve the driving surface, and extend the service life of the roadway. The roadway will be rehabilitated along the existing alignment, the existing pathway will be resurfaced, guardrail will be upgraded, site distance will be improved by clearing vegetation, and drainage conditions will be improved. The project may also include shoulder widening where possible, and additional pedestrian amenities and traffic calming through Moose Pass.
Please visit the project website at: http://www.sewardhighway25to36.com/
This is hidden text that lets us know when google translate runs.