The Homer Lake Street project will rehabilitate Lake Street between the Sterling Highway and Pioneer Avenue/East End Road. The project is intended to extend the life of the roadway, improve pedestrian and bicycle facilities, and improve drainage.
The project will:
- Rehabilitate 2,500 feet of pavement;
- Widen the road to the west and add bike lanes to both sides of the road;
- Reconstruct curb/gutter and sidewalk on the east side of the road;
- Re-establish existing ditches;
- Improve drainage by replacing failing culverts;
- Acquire right-of-way interests as needed; and
- Relocate utilities as needed.
Project Overview
Construction Schedule
Anticipate construction in spring 2021.
Project Manager
Clint Adler, PE, DOT&PF