The speed limit has been reduced to 35 miles per hour through the entire work zone from 600 West to Redwood Road. Please help our workers make it home to their families every night by reducing your speed in the work zone.

Speed reduced in work zone to 35 MPH.
We ask all drivers in work zones to:
- Slow down – drive the posted speeds, they're there for your safety.
- Be kind – our workers are out there helping to keep you safe and improve the roadways.
- Pay attention – both to workers directing you and surrounding traffic; put your phone down when behind the wheel.
- Stay calm – expect delays, leave early or take an alternate route if possible; no meeting or appointment is worth risking someone's life.
|
|
|
|
Construction Activities September 29 - October 4
- As early as Monday, October 2, crews will shift traffic lanes and remove the median on 9000 South near 900 West. Traffic will maintain two lanes in each direction; however, the center two-way turning lane will be removed.
- This work will take place overnight from 9:00 PM through 6:00 AM.
- Crews will be building up the road elevation starting with the new outside lanes in this area requiring the current shoulders to be removed.
- As early as October 3, access to the River Oaks Driving Range on 9000 South will be changed to a right-in, right-out only configuration through 2024.
- Crews are beginning the ground work to construct an additional traffic lane on 9000 South at the river bottom. In order to safely construct in this area, left turn access will be eliminated entering and existing the River Oaks Driving Range.
- For patrons of the River Oaks Driving Range, we encourage you to follow the detour map provided.
|
|
|
|
River Oaks Driving Range Suggested Access Route

|
|
|
|
- Utility relocation work by Rocky Mountain Power, Dominion Energy, Verizon, Comcast, Century Link, and other utility companies is continuing between 700 West and Redwood Road.
- Work on a new detention basin continues on property in front of the Rocky Mountain Power substation. This detention basin will serve as a temporary home for water during large storm events before slowly releasing it into the Jordan River.
- Structure work continues at the Jordan River along with storm drain improvements on the south side of 9000 South near the Jordan River.
- Crews are continuing to work on the new privacy walls between 1000 West and 1200 West on the south side of the street.
|
|
|
|
Nearby Construction Activities - 1300 West - West Jordan City Project
The West Jordan 1300 West project team will close northbound traffic on 1300 West between 9400 South and 9200 South starting September 13 lasting for the next three weeks. Visit the 1300 West project site to learn more.
|
|
|
|
Safety Reminder
Bicyclists should follow the posted detour routes (below) due to the narrow and shifting traffic lanes and the lack of shoulder space along 9000 South. Pedestrians are reminded to not walk in an active work zone and need to watch for construction vehicles as they have larger blind spots and may not be able to see you.

|
|
|
|
|
|
|
Area Projects
- To learn more about the West Jordan City 1300 West Widening Project, click here.
- To learn more about the Dominion Energy Gas Line Project, click here.
|
|
|
|
|
|
|