Project Design

The project will widen the existing corridor adding a center two-way-left-turn lane and pathways. See the typical sections below. 

The project will construct pathways on the north and south sides of the street as noted below:

North Pathway:  A 10-foot wide, paved pathway between Livingston Street and Rockridge Drrive and a 6-foot wide, recycled asphalt pahtway between Rickridge Drive and Hillside Drive.

South Pathway: A 6-foot wide, paved pathway between Birch Road and Rockridge Drive, connecting to the existing pahtway along Rockridge Drive which serves the surrounding neighborhood and O'Malley Elementary School.

Project Next Steps and Schedule

The next step is to complete the appraisal and acquisition of any additional right-of-way needed for the project and competitively bid the project for construction.  The project is scheduled to bid in December 2020.  Construction will begin in 2021 and take approximately two years.

 