The N.C. Department of Transportation proposes to improve N.C. 86 in Caswell County between Park Springs Road and the northern intersection of Old N.C. Highway 86.
Interactive Study Area Map
Project Overview
The North Carolina Department of Transportation (NCDOT) proposes to improve N.C. 86 in Caswell County between Park Springs Road and the northern intersection of Old N.C. Highway 86. The project also includes improvements at the southern intersection of N.C. 86 and Old N.C. Highway 86.
Improvements along the corridor include the construction of passing lanes and shoulder improvements at various locations, as well as turn lanes between Park Springs Road and the solid waste convenience center. These improvements will provide additional roadway capacity to improve traffic flow, allow motorists to safely pass slower-moving vehicles, and reduce travel delays. Safety enhancements are also included at the intersections of Park Springs Road and Old N.C. 86 with N.C. 86.
Old N.C. 86 intersects N.C. 86 at two separate locations within the project limits. At the southern intersection, the existing traditional intersection will be converted to a Reduced Conflict Intersection (RCI) to improve safety and reduce the potential for severe angle crashes.
The proposed roadway typical section includes two 12-foot travel lanes, with 12-foot passing lanes provided at select locations. Four-foot paved shoulders will be constructed on both sides of the roadway. Retaining walls are anticipated in areas where feasible to reduce impacts to adjacent properties and streams.
Project Map
To be added
Typical Sections
To be added
Reduced Conflict Intersections (RCI)
A reduced conflict intersection — sometimes referred to as a superstreet, a synchronized street or a median U-turn — is a general term used to describe several types of designs that can be used to improve safety and traffic flow on a highway. There are variations to the designs, but they all function the same by reducing by almost half the number of potential locations, or conflict points, where drivers and pedestrians can collide.
The most common type of reduced conflict intersection design eliminates left turns from side roads onto busy main roads. Raised medians direct traffic from the side road into turning right. When there is a safe opening in traffic, drivers enter the flow of traffic on the main route. To go the other direction, or cross the highway, they pull into a dedicated lane — typically less than 1,000 feet away —and make a U-turn. There might be a traffic signal at this location dependent on need.
In cases of dual right-turn lanes from the side road at a signalized intersection, drivers should stay in the left lane, if they intend to make the U-turn once on the main corridor.
RCI Traffic Movements
For additional information on Reduced Conflict Intersections please watch the video below.
Project Funding
Activity | Estimated Amount* |
Right of Way Acquisition | $ 0.4 Million |
Utility Relocations | $ 1.3 Million |
Construction | $ 26.6 Million |
Total Cost | $28.3 Million |
*Estimated costs are subject to change. Based on currently adopted NCDOT State Transportation Improvement Program.
Project Timeline
Milestone | Date* |
Right of Way Acquisition Begins | Spring 2027 |
Utility Relocations Begin | Spring 2028 |
Construction Begins | Spring 2029 |
*Future dates subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit before September 11, 2026
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: nc86-caswell@publicinput.com
Phone Number: 984-205-6615 enter project code 10270
Do you have any questions or comments about the overall project?
PROJECT CONTACT
Suzana Matta, PE
Project Engineer
NCDOT Division 7
P.O. Box 14996
Greensboro, NC 27415
PROJECT CONTACT
Farrell Nicholson, PE
Consultant Project Manager
Wetherill Engineering
1223 Jones Franklin Road
Raleigh, NC 27606
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here https://publicinput.com/NCDOT-Title-VI-Form
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos
Page last updated: August 11, 2026
PROJECT CONTACT
Suzana Matta, PE
Project Engineer
NCDOT Division 7
P.O. Box 14996
Greensboro, NC 27415