Edit Your Hub

Advanced portal settings Basic Settings

Title

Description

Communication Updates

Updates Description

Statistics

Stats Bar

42K
Responses
94K
Views
3K
Subscribers
7K
Participants
4K
Comments
37
Topics
Twitter

Twitter Handle

Map
Meetings
Skip Navigation

Sign up for UDOT Input

Create your profile to participate and customize your notification preferences on your profile page.

UDOT's vision is to keep Utah moving and we accomplish this by involving and informing citizens.

Current Projects

4800 South/2700 West (Roy) Signal Upgrade

Reminder: The 4800 South/2700 West intersection is fully closed, and will remain closed until Friday, September 30. Detours include 2875 West, 5600 South, and 2500 West (see map below).Upcoming Work Activities...

Participate

SR-108 Antelope Drive Renewed

Route:  SR-108 / Start Milepost: 0 - End Milepost: .694  Project Description:  The Utah Department of Transportation (UDOT) will resurface state route 108 in Davis County...

Participate

SR-65 Salt Lake County Renewed

Route:  SR-65 / Start Milepost: 3.109 - End Milepost: 8.43Project Description:  The Utah Department of Transportation (UDOT) will resurface state route 65 in Salt Lake County from the...

Participate

Restoration of I-215 / Union Park Ave. and Highland Dr. Flyover Bridges

UPDATE: The Highland Drive to westbound I-215 flyover bridge in Cottonwood Heights and Murray will reopen to traffic by 7:00pm on Wednesday, August 17th. Full closure of the flyover bridge was expected...

Learn More

US-89 Willard

UDOT has started designing improvements on US-89 from just south of SR-126 in South Willard to 3000 South in Perry. The pavement on US-89 is failing and needs to be replaced to extend the life...

Participate

SR-36 Median Barrier

The Utah Department of Transportation (UDOT) is constructing a median barrier on State Route (SR) 36 between Pole Canyon Road and Sunset Road in Lake Point to increase safety on SR-36 and the surrounding...

Participate

5400 S. and 1900 W. Intersection Improvements

UDOT is improving the 5400 South and 1900 West intersection. This project will install new drainage to smooth out the north side of the intersection and adjust signal timing to allow more vehicles to clear...

Participate

I-15 Washington Improved

No description yet. Click "Participate" to learn more.

Participate

US-40 Duchesne

  In an effort to preserve and extend the life of the pavement, UDOT will renew approximately 30 miles of U.S. 40 in Wasatch/Duchesne County between Soldier Creek near Strawberry Reservoir...

Participate

US-40 Daniels Summit

In an effort to extend the life of the pavement, UDOT renewed approximately seven miles of U.S. 40 in Wasatch County between Clegg Canyon and Daniels Summit in summer 2022. This work included sealing cracks...

Participate

SR-178 and SR-198 Renewed

 UPDATEThis week crews continue to work on raising utility manhole covers on SR-198. This work is expected to be finished by the end of this week. Crews will also be working on roadway striping...

Participate

SR-132 Renewed

UDOT SR-132 (100 North) Nephi, Utah Road ConstructionHOLIDAY WEEKENDTo allow for increased traffic this holiday weekend, crews will not be working Friday through Monday. Work will resume on Tuesday July...

Participate

University Avenue Bridge Replacement

PROJECT OVERVIEWUniversity Avenue (U.S. 189) is the primary corridor connecting the Orem-Provo area to the Heber Valley. In the area of 600 South in Provo, the roadway crosses over the Union Pacific Railroad...

Participate

Shepard Lane Interchange

No description yet. Click "Participate" to learn more.

Participate

SR-111 Bridge Removals

This safety improvement project includes removing the railroad bridges on S.R. 111 at 5500 S. and 7600 S, eliminating choke points and improving the shoulders.

Participate

I-15 Barrier in Juab County

OverviewThe Utah Department of Transportation (UDOT) will be installing cable barrier to enhance safety along I-15 between the Millard/Juab County line and Nephi. This new barrier will improve safety by reducing...

Participate

300 South Improved

 

12
12
Participate

SR-24 Torrey to Hanksville

Project BackgroundThe Utah Department of Transportation (UDOT) is rehabilitating and widening State Route 24 (SR-24) between Torrey and Hanksville. Work will continue throughout the summer. New guardrail...

Participate

SLCC Paving

No description yet. Click "Participate" to learn more.

Participate

US-40 Improved

Project OverviewThe Utah Department of Transportation (UDOT) is performing a pavement rehabilitation and bridge deck replacement project on U.S. 40. Work will take place from the Provo River bridge to...

Participate

I-15 St. George Improved

The Utah Department of Transportation (UDOT) is preparing an Environmental Assessment (EA), according to the National Environmental Policy Act (NEPA), to evaluate a potential new interchange at I-15 and...

97
104
Participate

Redwood Road Mobility

 PROJECT OVERVIEW:Taylorsville City in coordination with the Utah Department of Transportation (UDOT), plan to improve mobility and safety along Redwood Road between 4100 South and 5400...

Participate

Adams Avenue Bridge

No description yet. Click "Participate" to learn more.

Participate

US-191 Moab Corridor

Overview:The Utah Department of Transportation (UDOT) will be delivering three projects along US-191 starting June 2022.  Each project aims to rehabilitate or preserve the life of the...

Participate

U - 111; 11800 South to Herriman Boulevard Environmental Study

No description yet. Click "Participate" to learn more.

Participate

11400 South Solutions Development Study

THE PROJECTThe 11400 South Corridor Solutions Development Study is a proactive study seeking solutions for existing and future challenges. The end goal is to develop solutions to help implement the...

UDOT Utah Transportation Bangerter Lone Peak
743
154
Participate

Vineyard Connector

No description yet. Click "Participate" to learn more.

Vineyard Connector UDOT Utah Department of Transportation
Participate

Bluff Pedestrian Tunnel Improved

No description yet. Click "Participate" to learn more.

Participate

Orem 1600 North

No description yet. Click "Participate" to learn more.

13
13
Participate

Provo Canyon Barrier

The Utah Department of Transportation (UDOT) is adding and/or replacing median barrier along U.S. 189 through Provo Canyon. 

Participate

Geneva Road Improved

No description yet. Click "Participate" to learn more.

Participate

SR-30 Buttercup Turn Lanes

 Project Overview:  The Utah Department of Transportation (UDOT) is planning construction at state route 30 (Bear Lake Blvd.) and Buttercup Lane.  The purpose of the work is to update...

Participate

Sandy-State Street Rehabilitation

Project Overview:   Coming in 2022, this planned project is currently in the design and ROW phase.  The project includes resurfaced asphalt, upgraded ADA Compliant Pedestrian Ramps, Drainage...

Participate

SR-150 Improved

[ CLICK THE TABS BELOW FOR THE LATEST 'PROJECT SPECIFIC' INFORMATION ]

Participate

Coal Creek Bridge

‚Äč

Participate

UDOT Planning

No description yet. Click "Participate" to learn more.

4,677
475
Participate

Pleasant Grove Interchange

No description yet. Click "Participate" to learn more.

Participate

4500 South and Atwood Boulevard

WELCOME TO THE ONLINE PUBLIC HEARINGThe public is invited to participate in an online public hearing to review and provide feedback on proposed improvements to the intersection of 4500 South and Atwood...

14
27
Participate

Programming Public Comment

The Utah Transportation Commission and UDOT are inviting public comment on proposed project programming.

Participate

Pleasant Grove Improvements

No description yet. Click "Participate" to learn more.

Participate

2000 West; West Point to Clinton

Project OverviewThe Utah Department of Transportation (UDOT), in coordination with the cities of West Point and Clinton, has initiated a roadway widening and improvement project on 2000 West (SR-108) between...

Participate

SR-68 (Redwood Road); 6200 South to I-215

No description yet. Click "Participate" to learn more.

31
31
Participate

I-15 Springville/Spanish Fork Interchange

 

50
67
Participate

Heber Valley Corridor EIS

The Utah Department of Transportation’s (UDOT) mission is to keep Utah moving while enhancing quality of life through transportation improvements in our state. UDOT is conducting an Environmental...

863
2,140
Participate

STIP, ACIP, and Rural Transit Program Public Comment

UDOT’s Statewide Transportation Improvement Program (STIP) and Airport Capital Improvement Plan (ACIP) are a six-year plan of highway, transit, and airport projects for the State of Utah.The STIP...

Participate

Past Projects

[DONE] US-6 & Powerhouse Rd. Safety Enhancements

Project Overview:This Utah Department of Transportation (UDOT) will construct a new High-T (3-way) traffic signal to enhance safety at the intersection of U.S. 6 and Powerhouse Rd. in Spanish Fork. ...

View Results

[DONE] S.R. 204 (Wall Ave.) & 20th St. Updated

Project Overview:The Utah Department of Transportation (UDOT) will modify an existing roadway intersection @ Wall Avenue (S.R. 204) and 20th Street in Ogden.  The updates will include turn lane modifications,...

View Results

[DONE] Logan Canyon Fiber Optic

 Project Overview:Utility work will take place along shoulders and ditches along US-89 from MP 491 (see image) to 100 W. in Garden City.  Advanced Traffic Management System (ATMS) require a high-speed...

View Results

I-15 Bridges in Cedar City

This project will replace two bridges on I-15 near milepost 61 over East Nichols Canyon Road in Cedar City, UT. Work began on this project in July 2021 and is anticipated to be finished in the...

View Results

Meetings & Events

Boards & Committees