HL-0008J: N.C. 50 at Rand Road
HL-0008J: N.C. 50 at Rand Road
The N.C. Department of Transportation proposes widening N.C. 50 (Benson Road) between Rand Road and Buffaloe Road. Intersection improvements along the corridor will be included in this project.
Interactive Project Study Area Map:
Project Overview
The project proposes roadway widening and intersection improvements on N.C. 50 (Benson Road) from south of Rand Road to north of Buffaloe Road.
On Benson Road the project will:
construct one additional through lane in each direction
construct a new bridge over Swift Creek upstream of the existing bridge (for southbound traffic)
construct curb and gutter on each side of the roadway
construct a proposed shared-use path along the west side and a sidewalk along the east side
construct improvements at the Benson Road and Rand Road intersection
Traffic volumes are expected to continue to increase along the Benson Road corridor. NCDOT evaluates roadway and traffic performance using a metric known as Level of Service (LOS) as shown below.
By the year 2050, the signalized Benson Road and Rand Road intersection is expected to operate at an undesirable overall Level of Service E during the morning peak and LOS F during the evening peak periods. Implementation of STIP Project No. HL-0008J will decrease the delays experienced at the intersection. With the improvements proposed, in 2050 the intersection is projected to operate at LOS D during the morning peak and LOS B during the evening peak.
The signalized Benson Road and Buffaloe Road intersection is expected to operate at an undesirable overall LOS F during the evening peak in the future year. Implementation of STIP HL-0008J will decrease the delays experienced at the intersection, and in 2050, the intersection will operate at LOS D during both peak hours.
History
N.C. 50 (Benson Road) is a regionally significant corridor that runs parallel to Interstate 40 between the cities of Garner and Benson. The need for improvements to Benson Road was first identified in the 2003 Wake County Transportation Plan. The corridor carries significant traffic volumes, considerable future development is expected in the area, thus, traffic volumes will continue to increase. The Wake County Transportation Plan recommended widening Benson Road between U.S. 70 and Mount Pleasant Road to four lanes with a landscaped median. This project represents a portion of the corridor recommended for widening. Additional studies were completed between 2011 and 2018 recommending similar improvements to the corridor.
The Strategic Transportation Investments (STI) law includes a provision for a funding allocation to local governments based on funding contributed by the local government to transportation projects or revenue from tolling. This bonus allocation can be used to fund the construction of other eligible highway projects.
Early in 2020, the Capital Area Metropolitan Planning Organization (CAMPO) received notice from NCDOT that there would be a bonus allocation to CAMPO from the N.C. 540 (toll road) project. This project, at the intersection of N.C. 50 and Rand Road, was one of several selected by CAMPO for the bonus allocation funding. NCDOT began project development work for the project in early 2021.
Project Funding
Project cost estimates are currently being developed. Costs will be shown here as they become available.
| Estimated Amount* |
Right of Way Acquisition | $ TBD |
Utility Relocation | $ 0.6 Million |
Construction | $ 14.3 Million |
Total Cost | $ TBD |
* Estimated costs are subject to change
Project Timeline
Milestone | Date* |
Environmental Document Complete | Spring 2024 |
Right of Way Acquisition | Fall 2024 |
Letting of Project | Spring 2026 |
* Future dates are preliminary and subject to change
PROJECT CONTACT INFORMATION
Zahid Baloch, PE | Jonathan Soika, PE |
NCDOT Project Manager | Consultant Project Manager |
Highway Division 5 | VHB |
1573 Mail Service Center Raleigh, NC 27699-1573 | Venture I 940 Main Campus Drive - Suite 500 Raleigh, NC 27606-5217 |
NC50-RandRd@PublicInput.com984-205-6615 Enter Project Code 4411 to leave a message
COMMENTS/QUESTIONS
Comments may be submitted below, via phone, email (NC50-RandRd@PublicInput.com), U.S. Mail to the Project Manager listed above, or at any meeting.
All comments received carry equal weight, regardless of submission method.
All comments will be reviewed and suggestions/recommendations
incorporated into designs where feasible.
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos