Project Design

The proposed project design will include: 

  • A roundabout connecting Bailey Rd., Bailey Rd. Extension and Poole Place Dr.  

  • Removal of the sharp curve in the existing Bailey Rd. alignment

  • A 10’ multi-use path to connect the roundabout to the Caldwell Station Creek Greenway

  • Bailey Road will be grade separated from the existing Caldwell Station Creek Greenway

 

*Based on the proposed project impacts to the Caldwell Station Creek Greenway and proposed Bailey Road Park, both of which are Section 4(f) resources, NCDOT and the Federal Highway Administration propose to make a Section 4(f) de minimis determination pursuant to 23 CFR 774.3. The project design is consistent with the Town of Cornelius Comprehensive Parks and Greenways Master Plan 2015-2025.

Roundabouts

The N.C. Department of Transportation builds roundabouts to improve safety for drivers, pedestrians and bicyclists. They also help reduce the congestion and backups more typical of traditional intersections with stop signs and traffic signals.

A driver generally enters the roundabout more quickly than if waiting at a traffic signal. In addition, the modern roundabout is much smaller than older traffic circles and requires vehicles to travel at lower speeds (15-20 mph), making them safer than traffic circles. Additionally, the slower speeds make it easier for a driver to find a gap in traffic inside the roundabout before safely entering it.​

For more information on roundabouts, please watch the following video:

Project Funding 

 

Estimated Amount*

Development and Design

$490,000

Right-of-Way

$2,064,000

Construction

$4,632,000

Total Costs

$7,186,000

* Estimated costs are subject to change. Based on currently adopted NCDOT State Transportation Improvement Program (STIP).

Project Timeline 

Milestone

Date*

Project Newsletter

October 2021

Environmental Document

Winter 2021

Begin Right-of-Way

Fall 2022

Begin Construction

October 2025

* Future dates are preliminary and subject to change

Project Comments

 Due to Covid-19, NCDOT has suspended in-person meetings until further notice.

NCDOT accepts comments throughout all phases of project development.

The public is encouraged to leave any questions using this website below, project email or phone number.

 

Project Email: baileyrd-us21@publicinput.com 

Project Phone Number: 984-205-6615 enter project code 4806

 

Question title

Would you like to be added to the project mailing list?

Project Contact

Yanwei Ma, PE

NCDOT Division 10

716 West Main Street

Albemarle, NC 28001

 

baileyrd-us21@publicinput.com

984-205-6615 code 4806

 

RESOURCES FOR PROPERTY OWNERS 


Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.  

     
Right-of-Way Brochure Single Page Layout      Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions

Right of way Acquisition Process Videos

English                                                                     Spanish