Interactive Study Area Map:

Project Overview

The N.C. Department of Transportation proposes to replace the bridge on Old Holly Springs Apex Road (S.R. 1153) over Little Branch.  The existing bridge is functionally obsolete, meaning the bridge is safe but does not meet today’s modern design standards.

The new bridge will be located to the east of the existing bridge, and traffic during construction will be maintained on the existing bridge. The project will include upgrades to the existing roadway approaches, and the new bridge will include a ten foot multi-use path on the east side of the bridge, as shown in the typical section figure below.

 

Project Map

Click here or on the map image to open the map in a new window for downloading or viewing.

 

Typical Section

Project Funding:

 Activity

 Cost* 

Right of Way Acquisition

$0.25 Million

Utility Relocation

$1.30 Million

Construction

$7.10 Million

Total Project Cost

$8.65 Million

*Estimated costs are subject to change. 

Project Timeline:

 Activity

Anticipated Date*

Environmental Document

2025

Right of Way Acquisition Begins

Fall 2025

Construction Begins

Summer 2034

*Future dates subject to change

Project Comments

 

NCDOT accepts comments throughout all phases of project development.  

All comments will be taken into consideration, and carry equal weight, regardless of submittal method.

To submit comments for consideration during the current phase of project development,

please submit before July 8, 2024


The public is encouraged to leave comments using this webpage, email, or phone number:

 

Email: oldhollysprings-apexrd@publicinput.com

Phone Number:  984-205-6615    enter project code 5738

Question title

Would you like to be added to the project email list?

Question title

Do you have any comments or questions regarding the proposed project?

PROJECT CONTACT INFORMATION 

Christopher A. Murray, SPWS

Project Engineer

NCDOT Division 5

2612 N. Duke Street

Durham, NC 27704

PROJECT CONTACT INFORMATION 

Bryan Lambeth, P.E.

Consultant Project Manager

Dewberry

2610 Wycliff Road, Suite 410

Raleigh, NC 27607

Title VI Feedback

To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?

If so, please click here https://publicinput.com/NCDOT-Title-VI

 

RESOURCES FOR PROPERTY OWNERS 


Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.  

     
Right-of-Way Brochure Single Page Layout      Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions

Right of way Acquisition Process Videos

English                                                                     Spanish