Tuntutuliak: DOT&PF Emergency Repair Work
Tuntutuliak: DOT&PF Emergency Repair Work
DOT&PF is providing updates for each community and has built tools to report damages and request assistance. This page will help you see real-time updates in your community for infrastructure repairs & road access, water & sanitation status, and local recovery progress & resources.
Reporting Damage: If your home, property, or infrastructure was damaged, please report it using our Damage Assessment Hub at: https://damage-assessment-2-akdot.hub.arcgis.com
Need materials or assistance: If your community hasn’t connected with DOT&PF yet, reach out to dot.ask@alaska.gov - we’ll help coordinate approvals and connect you to supplies quickly.
DOT&PF Emergency Response Manager: Amber Shumpert, amber.shumpert@alaska.gov, 907-322-0603.
Water and sewer updates: check Alaska DEC West Coast Storm.
Tuntutuliak Operations Summary
No change until further notice.
12/2/2025
Daily Activities
- UICC, DFS, LKSD met regarding needed lift station repairs. LKSD personnel is going to attempt to repair in-house and will reach out for assistance.
- Currently the lift station has to be operated manually everyday as the float sensors are not working properly. Replacement of the floats should fix the problem.
11/29/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
Daily Activities
- UICC team member will be on-site to inventory materials and plan/prep for LKSD repairs. Looking for LKSD point of contact to connect with.
11/28/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/27/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/26/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/25/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/23/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/21/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
Daily Activities
- UICC team member will be on-site to inventory materials and plan/prep for LKSD repairs. Looking for LKSD point of contact to connect with.
11/20/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/19/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
1/18/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/15/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
Daily Activities
- Working on timeline for UICC to be on-site to start repairs.
- Insulation replacement/repairs needed at teacher housing identified as priority, will coordinate with LKSD on repair efforts.
11/14/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/13/2025
- No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/11/2025
- Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/10/2025
- No Change: Initial site visit and work plan are complete.
- Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
- No Change: UICC in Tuntutuliak November 4 and indicates team returned to Anchorage; waiting for update from UICC.
11/09/2025
- No Change: Initial site visit and work plan are complete.
- Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/08/2025
- No change: Initial site visit and work plan are complete.
- Brice will mobilize a crew to repair the board road, pending a hard freeze support a small drill rig.
11/06/2025
- Work plan finalized; primary issue is main board road damage.
- Brice, Inc. crew and mobile drill rig on standby; ground too soft until freeze.
- Mobilization expected within days once freeze-up supports equipment.
- Interim footpaths marked; materials arranged for transport with crew.
- UICC in Tuntuliak.
11/05/2025
- No Change: Initial site visit and work plan are complete.
- Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/04/2025
- No Change: Initial site visit and work plan are complete.
- Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
11/01/2025
- No Change: Initial site visit and work plan completed. Brice Construction will mobilize crew to repair board road but will have to wait for hard freeze to accommodate a small drill rig.
11/03/2025
- No Change: Initial site visit and work plan completed. Brice Construction will mobilize crew to repair board road but will have to wait for hard freeze to accommodate a small drill rig.
10/28/2025
- Initial site visit and work plan completed. Brice will mobilize crew to repair board road but will have to wait for hard freeze to accommodate a small drill rig.
10/28/2025
- Contractor meeting to determine next steps.
10/26/2025
- Site assessment completed, and planning to repair board road failure section once hard freeze achieved so small drill rig can drive piling.
10/23/2025 - Infrastructure Damage Assessment.
10/19/2025
- Early load of gravel arrives.
10/14/2025 - Infrastructure Damage Assessment.
10/19/2025 - Early load of gravel arrives