Tuntutuliak Operations Summary

2/23/26

  • Brice: Hog River delivering and staging material for boardwalk installation work. 

2/16/26

  • Brice: Hog River delivering and staging material for boardwalk installation work. 

2/10/26

  • Brice: Hog River delivering and staging material for boardwalk installation work. 

1/31/26

  • Brice: Hog River delivering and staging material for boardwalk installation work. 

1/28/26

  • Brice: Boardwalk demo and repair, and prepping for helical pile install work

1/18/26

  • Brice: boardwalk demo and repair and prepping for helical pile install work.

1/17/2026

  • Brice: First day onsite. Prepping for boardwalk demo/repair and helical pile install work. 

1/14/2026

  • Brice will mobilize a crew to repair the board road, pending a hard freeze. 

1/13/2026

  • Brice will mobilize a crew to repair the board road, pending a hard freeze. 

12/2/2025

Facilities Daily Report

  • UICC, DFS, LKSD met regarding needed lift station repairs. LKSD personnel is going to attempt to repair in-house and will reach out for assistance. 
  • Currently the lift station has to be operated manually everyday as the float sensors are not working properly. Replacement of the floats should fix the problem. 

11/29/2025

  • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

Facilities Daily Report

    • UICC team member will be on-site to inventory materials and plan/prep for LKSD repairs. Looking for LKSD point of contact to connect with. 

    11/28/2025

    • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

    11/27/2025

    • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

    11/26/2025

    • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

    11/25/2025

    • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

    11/23/2025

    • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

    11/21/2025

    • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

    Facilities Daily Report

      • UICC team member will be on-site to inventory materials and plan/prep for LKSD repairs. Looking for LKSD point of contact to connect with. 

      11/20/2025

      • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

      11/19/2025

      • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

      1/18/2025

      • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig. 

      11/15/2025

      • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig. 

      Facilities Daily Report

        • Working on timeline for UICC to be on-site to start repairs. 
        • Insulation replacement/repairs needed at teacher housing identified as priority, will coordinate with LKSD on repair efforts. 

        11/14/2025

        • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig. 

          11/13/2025

          • No Change: Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig. 

          11/11/2025

          • Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig. 

          11/10/2025

          • No Change: Initial site visit and work plan are complete.
          • Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.
          • No Change: UICC in Tuntutuliak November 4 and indicates team returned to Anchorage; waiting for update from UICC.

          11/09/2025

          • No Change: Initial site visit and work plan are complete.
          • Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

          11/08/2025

          • No change: Initial site visit and work plan are complete.
          • Brice will mobilize a crew to repair the board road, pending a hard freeze support a small drill rig.

          11/06/2025

          • Work plan finalized; primary issue is main board road damage.
          • Brice, Inc. crew and mobile drill rig on standby; ground too soft until freeze.
          • Mobilization expected within days once freeze-up supports equipment.
          • Interim footpaths marked; materials arranged for transport with crew.
          • UICC in Tuntuliak.

          11/05/2025

          • No Change: Initial site visit and work plan are complete.
          • Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

          11/04/2025

           

          • No Change: Initial site visit and work plan are complete.
          • Brice will mobilize a crew to repair the board road, pending a hard freeze to support a small drill rig.

          11/01/2025

           

          • No Change: Initial site visit and work plan completed. Brice Construction will mobilize crew to repair board road but will have to wait for hard freeze to accommodate a small drill rig. 

          11/03/2025

           

          • No Change: Initial site visit and work plan completed. Brice Construction will mobilize crew to repair board road but will have to wait for hard freeze to accommodate a small drill rig. 

          10/28/2025

           

          • Initial site visit and work plan completed. Brice will mobilize crew to repair board road but will have to wait for hard freeze to accommodate a small drill rig.

          10/28/2025

          • Contractor meeting to determine next steps.

          10/26/2025

          • Site assessment completed, and planning to repair board road failure section once hard freeze achieved so small drill rig can drive piling.

          10/23/2025 - Infrastructure Damage Assessment.


          10/19/2025

          • Early load of gravel arrives.

          10/14/2025 - Infrastructure Damage Assessment.

          1/31/26