Kwinhagak/Quinhagak: DOT&PF Emergency Repair Work
Kwinhagak/Quinhagak: DOT&PF Emergency Repair Work
DOT&PF is providing updates for each community and has built tools to report damages and request assistance. This page will help you see real-time updates in your community for infrastructure repairs & road access, water & sanitation status, and local recovery progress & resources.
Reporting Damage: If your home, property, or infrastructure was damaged, please report it using our Damage Assessment Hub at: https://damage-assessment-2-akdot.hub.arcgis.com
Need materials or assistance: If your community hasn’t connected with DOT&PF yet, reach out to dot.ask@alaska.gov - we’ll help coordinate approvals and connect you to supplies quickly.
DOT&PF Emergency Response Manager: Amber Shumpert, amber.shumpert@alaska.gov, 907-322-0603.
Water and sewer updates: check Alaska DEC West Coast Storm.
Kwinhagak/Quinhagak Operations Summary
12/3/2025
- Slow progress the last couple days due to weather.
12/2/2025
- Continued to fill super sacks, placed 160.
11/30/2025
- Continued to fill super sacks, stockpiled 590 sacks to date.
11/29/2025
- Continued to fill super sacks, stockpiled 475 sacks to date.
11/28/2025
- Continued to fill super sacks. Once weather turns bad, hauling and placement of super sacks will begin. 360 sacks to fill so far.
11/26/2025
- Continued to fill super sacks. Once weather turns bad, hauling and placement of super sacks will begin.
11/25/2025
- Continued to stockpile at the beach for preparation of filling super sacks.
11/23/2025
- Continued to stockpile at the beach for preparation of filling super sacks.
11/21/2025
- Prepping material site for filling super sacks.
- Started beach access road for super sack placement.
11/20/2025
- No Change: Filling in erosion at end of Mission Road, approximately 6:1 slope.
- Started beach access road for super sack placement.
11/19/2025
- No Change: Filling in erosion at end of Mission Road, approximately 6:1 slope.
11/18/2025
- Filling in erosion at end of Mission Road.
11/15/2025
- Attempting to mobilize 4 people to site, pending weather.
11/14/2025
- Planning to mobilize 4 people to the site on Saturday (11/15/2025).
11/13/2025
- Planning to mobilize 4 people to the site on Saturday (11/15/2025).
11/11/2025
- Super sacks have arrived.
- Will use local equipment and operators to haul materials to beach site.
11/10/2025
- Super sacks have arrived; planning in place to begin work.
11/09/2025
- No Change: Super sacks scheduled to arrive today, crews mobilizing to site in the next couple days.
- Working with community to hire local operators and utilize equipment.
11/08/2025
- Erosion control along Kanektok River initiated.
- “Super Sacks” (1-ton sandbags) arrived Nov 6; foundation work began Nov 7.
- Access road to shoreline prepared; geotextile and sandbag revetment under construction through weekend.
- Temporary barrier expected early next week to protect homes/utilities through winter; informs permanent design.
11/05/2025
- No Change: Super Sacks scheduled to arrive today, crews mobilizing to site in the next couple days.
11/04/2025
- No Change: Super Sacks scheduled to arrive today, crews mobilizing to site in the next couple days.
11/03/2025
- Super Sacks scheduled to arrive today, crews mobilizing to site in the next couple days.
11/01/2025
- No Change: Super Sacks for sewage lagoon erosion control schedule delayed due to weather.
10/28/2025
- Super Sacks for sewage lagoon erosion control scheduled for arrival on 10/29/25, pending weather.
10/19/2025 - Infrastructure Damage Assessment.
12/2/2025
11/30/2025
11/29/2025
11/28/2025
11/26/2025
11/21/2025