Kasigluk Operations Summary

11/18/2025

  • No Change: Working on sourcing materials. Mass X working at Bethel airport. 

11/15/2025

  • No Change: Working on sourcing materials. 

11/14/2025

  • No Change: Working on sourcing materials. 

11/13/2025

  • No Change: Working on sourcing materials. 

11/11/2025

  • Working on sourcing materials. 

11/10/2025

  • No change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans.
  • No change: Mass X crew are currently working at Bethel Airport to build out out loads for Chinook.
  • No Change: Crews mobilizing to Atmautluak later this week.

11/09/2025

  • No Change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans.

  • No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.


11/08/2025

  • Construction not started; planning/staging active with Mass X.
  • Joint assessments complete; Bethel hub staging pallets of materials.
  • CH-47 airlifts planned for deliveries to Kasigluk/nearby communities.
  • Stable and monitored; crews to deploy once conditions/logistics allow.

11/05/2026

  • No Change: Mass X personnel and ADOT Project Engineer are developing work plans.
  • No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.

11/04/2025

  • No Change: Mass X personnel and ADOT Project Engineer are developing work plans.
  • No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.

11/03/2025

  • No Change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans.
  • No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.

11/1/2025

  • No Change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans for communities.
  • Lumber order being complied for shipment to Atmautlauk.
  • Sourced helical pile driver from local connection.

10/30/2025

  • Mass X personnel & ADOT Project Engineer are developing work plans for communities. Lumber order being complied for shipment to Atmautlauk. Sourced helical pile driver from local connection.


10/25/2025

  • Arrived on-site this afternoon and found minor damage at the airport.
  • Located the local maintenance person and Tribal administrator and discussed damage to the community.
  • Observed minor airport damage and some erosion at the SREB.
  • They connected us with Peter, who transported us across the river by boat to assess damage in Old Kasigluk.
  • Noted damage to a section of the elevated boardwalk.
  • Identified three houses on the south end and two on the north end with minor foundation issues resulting from the flood.
  • Contractor MASS-X is currently working on logistics, procuring materials, and staffing.

10/17/2025 - New Kasigluk & Old Kasigluk Infrastructure Damage Assessment.


10/15/2025 - Infrastructure Damage Assessment.