Kasigluk: DOT&PF Emergency Repair Log
Kasigluk: DOT&PF Emergency Repair Log
DOT&PF is providing updates for each community and has built tools to report damages and request assistance. This page will help you see real-time updates in your community for infrastructure repairs & road access, water & sanitation status, and local recovery progress & resources.
Reporting Damage: If your home, property, or infrastructure was damaged, please report it using our Damage Assessment Hub at: https://damage-assessment-2-akdot.hub.arcgis.com
Need materials or assistance: If your community hasn’t connected with DOT&PF yet, reach out to dot.ask@alaska.gov - we’ll help coordinate approvals and connect you to supplies quickly.
DOT&PF Emergency Response Manager: Amber Shumpert, amber.shumpert@alaska.gov, 907-322-0603.
Water and sewer updates: check Alaska DEC West Coast Storm.
Kasigluk Operations Summary
11/18/2025
- No Change: Working on sourcing materials. Mass X working at Bethel airport.
11/15/2025
- No Change: Working on sourcing materials.
11/14/2025
- No Change: Working on sourcing materials.
11/13/2025
- No Change: Working on sourcing materials.
11/11/2025
- Working on sourcing materials.
11/10/2025
- No change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans.
- No change: Mass X crew are currently working at Bethel Airport to build out out loads for Chinook.
- No Change: Crews mobilizing to Atmautluak later this week.
11/09/2025
No Change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans.
No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.
11/08/2025
- Construction not started; planning/staging active with Mass X.
- Joint assessments complete; Bethel hub staging pallets of materials.
- CH-47 airlifts planned for deliveries to Kasigluk/nearby communities.
- Stable and monitored; crews to deploy once conditions/logistics allow.
11/05/2026
- No Change: Mass X personnel and ADOT Project Engineer are developing work plans.
- No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.
11/04/2025
- No Change: Mass X personnel and ADOT Project Engineer are developing work plans.
- No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.
11/03/2025
- No Change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans.
- No Change: Mass X crew are currently working at Bethel Airport to build out loads for Chinook.
11/1/2025
- No Change: Mass X personnel and Alaska DOT&PF Project Engineer are developing work plans for communities.
- Lumber order being complied for shipment to Atmautlauk.
- Sourced helical pile driver from local connection.
10/30/2025
Mass X personnel & ADOT Project Engineer are developing work plans for communities. Lumber order being complied for shipment to Atmautlauk. Sourced helical pile driver from local connection.
10/25/2025
- Arrived on-site this afternoon and found minor damage at the airport.
- Located the local maintenance person and Tribal administrator and discussed damage to the community.
- Observed minor airport damage and some erosion at the SREB.
- They connected us with Peter, who transported us across the river by boat to assess damage in Old Kasigluk.
- Noted damage to a section of the elevated boardwalk.
- Identified three houses on the south end and two on the north end with minor foundation issues resulting from the flood.
- Contractor MASS-X is currently working on logistics, procuring materials, and staffing.
10/17/2025 - New Kasigluk & Old Kasigluk Infrastructure Damage Assessment.
10/15/2025 - Infrastructure Damage Assessment.