Napaskiak Operations Summary

4/25/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Fuel tanks transported to Kipnuk.

  • Total of five HRC team members onsite. 


4/24/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 11 HRC team members onsite. 


4/22/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 15 HRC team members onsite. 

Work performed by UIC Construction

  • Section 1 Central #17: Completed sewer line repairs and associated exterior repairs needed to resolve the leak.  
  • Section 1 Central #17: Completed building exterior repair work and general site cleanup.  

  • Camp House: Performed general cleanup, organization, and equipment maintenance in preparation for demobilization.  

  • Section 1 Central #17/Section 3 West #10: Performed repairs on heating system components and installed required protective elements.  

  • Section 3 East: Completed heating system and exterior protective repairs throughout the section; verified all assigned housing units were completed.  

  • Section 3 Central and Section 3 West: Completed remaining heating system and exterior protective repairs; prepared for full demobilization of equipment.  

  • Tribal Council Storage Facility/Camp House: Delivered remaining project materials, completed cleanup, and finalized demobilization activities. 


4/21/2025

Facilities Daily Report

  • Work performed by UIC Construction.

  • Section 1 Central #17: Completed sewer line repairs and associated exterior repairs needed to resolve the leak. 

  • Section 1 Central #17: Completed building exterior repair work and general site cleanup. 

  • Camp House: General cleanup, organization, and equipment maintenance in preparation for demonization. 

  • Section 1 Central #17/Section 3 West #10: Repaired heating system components and installed required proactive elements. 

  • Section 3 East: Completed heating system and exterior protective repairs; verified all assigned housing units were completed. 

  • Section 3 Central and Section 3 West: Completed remaining heating system and exterior protective repairs; prepared for full demobilization of equipment. 

  • Tribal Council Storage Facility/Camp House: Delivered remaining project materials; completed cleanup and finalized demobilization activities. 


4/20/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 27 HRC team members onsite. 


4/18/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 33 HRC team members onsite. 


4/17/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 31 HRC team members onsite. 


4/16/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 22 HRC team members onsite. 


4/15/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 27 HRC team members onsite. 


4/14/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 31 HRC team members onsite. 


4/11/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 30 HRC team members onsite. 


4/10/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 26 HRC team members onsite. 


4/09/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 34 HRC team members onsite. 


4/08/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 33 HRC team members onsite. 


4/05/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 23 HRC team members onsite. 


4/04/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 30 HRC team members onsite. 

Work performed by UIC Construction

  • Installed, repaired, and reworked cladding on multiple sections/buildings; corrected improper overlaps allowing water intrusion; cut and rolled additional cladding pieces as needed.
  • Framed, insulated, sheathed, and completed plumbing chases across Section 1 (West/Central) and Section 3 (East/West). 
  • Replaced cracked ABS and damaged clamps. Retaped heat trace; implemented improved process for 90 degree angled connections to ensure clean, functional finishes. 
  • Installed new insulation and radiant wrap; retaped heat trace; completed insulated connections and remediated damaged or missing insulation. 

4/03/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 34 HRC team members onsite. 

Work performed by UIC Construction

  • Installed, repaired, and reworked cladding on multiple sections/buildings; corrected improper overlaps allowing water intrusion; cut and rolled additional cladding pieces as needed.
  • Framed, insulated, sheathed, and completed plumbing chases across Section 1 (West/Central) and Section 3 (East/West). 
  • Replaced cracked ABS and damaged clamps. Retaped heat trace; implemented improved process for 90 degree angled connections to ensure clean, functional finishes. 
  • Installed new insulation and radiant wrap; retaped heat trace; completed insulated connections and remediated damaged or missing insulation. 

4/02/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 35 HRC team members onsite. 


4/01/2025

Facilities Daily Report

  • Work performed by Hog River Construction.

  • Continued transporting lumber. 

  • Total of 20 HRC team members onsite.