Route 16 Bridge Replacement Tazewell

Route 16 Bridge Replacement Tazewell

The primary purpose of this project is to improve safety by completing a bridge replacement on Route 16 (Fairground Road) across the Clinch River in the Town of Tazewell.

The project includes replacing the existing 22-foot-wide, two-lane, double-span structure with a 30-foot-wide, two-lane, single-span structure.

During construction, to safely complete the bridge replacement, the road at the bridge location will be closed, and a temporary detour will be in place.

This area sees approximately 2,485 vehicles per day.

Construction is anticipated to begin in Late 2028.

The project cost is approximately $8.44 million.

 

Public Outreach

A design public hearing was held for this project Tuesday, December 16, 2025 at Tazewell Town Hall. The public comment period closed on December 26, 2025. 

 

Location and Design Public Hearing Materials 

 

VDOT Project Page
 

Resources
Contact Information: 
Ron Flanary, Project Manager
276-669-6151

Phase: Design Phase

UPC: 113876

Lat/Long:
37.129246, -81.54979

Locality: Town of Tazewell/Bristol District 

Translation assistance: For translation assistance, please call the VDOT Bristol District Office at 276-669-6151. More information on Translation services can be acccessed here.

Provide Project Feedback

Contact Information

(required) Contact Information (optional):

How will the roundabouts affect your daily travel?

Closed for Comments

Has property access been properly addressed? If not, please provide additional information.

Closed for Comments

Please provide us with any information that you believe will assist VDOT in developing the final design of this project.

Closed for Comments

Did the meeting help you understand the project better?

Yes
100%
No
0%
Other
0%
Closed to responses | 2 Responses

How did you hear about this meeting?

Social media
50%
Road sign
50%
Newspaper
0%
Direct mail
0%
Project website
0%
Other
0%
Closed to responses | 2 Responses