Deering Operations Summary

Completed 11/28. No change until further notice. 


11/23/2025

  • No Change: Riprap haul to east side of town erosion.

11/21/2025

  • No Change: Riprap haul to east side of town erosion.

11/20/2025

  • No Change: Riprap haul to east side of town erosion.

11/19/2025

  • Riprap haul to east side of town erosion.

11/18/2025

  • Riprap haul to east side of town erosion. 

11/15/2025

  • Borrow haul to erosion site near clinic. 

11/14/2025

  • Riprap haul to erosion site on east end of town. 

11/13/2025

  • Riprap haul to erosion site. 

11/11/2025

  • Continuing to sort rock and develop borrow in pits. 
  • Shaping slopes, placing gravel and geotextile. 

11/10/2025

  • Continuing to sort rock and develop borrow in pits.
  • Shaping slopes, placing gravel and geotextile.

11/09/2025

  • Continuing to sort rock and develop borrow in pits.
  • Haul schedule to begin tomorrow.

11/08/2025

  • Local quarry operations launched (controlled blasting) to produce riprap/fill.
  • Stockpiles created for shoreline armoring and runway embankment reinforcement.
  • Placement to begin as weather allows; strong local support for hauling.
  • Continuing to sort rock and develop borrow in pits.
  • Haul scheduled to begin tomorrow.

11/06/2025

  • Blasting for pit development. Excavator sorting riprap.

11/05/2025

  • Herc arrived with supplies.
  • Blasting at 2pm today.

11/04/2025

  • Pit development ongoing.
  • Continued trying to get equipment operational.
  • Contractor and DOT personnel are moving to new housing.
  • Expecting herc with end dump and trailer on Wednesday.
  • Blasting tomorrow afternoon.

11/03/2025

  • Pit development ongoing.
  • Continued trying to get equipment operational.
  • Contractor and DOT personnel are moving to new housing.
  • Expecting herc with end dump and trailer on Tuesday.
  • Blasting tomorrow afternoon.

10/30/2025

  • Brice mobilization in progress, fixing local equipment for use. Herc arrived with drill rig and geotextile today.
  • Contractor plans to start working the pit this weekend with more equipment arriving Tuesday.

10/26/2025

  • Brice mobilizing this weekend. 

10/25/2025 - Infrastructure Damage Assessment.


10/16/2025 - Infrastructure Damage Assessment.

11/18/2025


11/14/2025


11/13/2025


11/6/2025

Riprap sorting


11/5/2025

Deering 11/05/2025

Herc arrived with supplies


11/3/2025


10/30/2025

Herc arrived with drill rig and geotextile today.