Deering: DOT&PF Emergency Repair Work
Deering: DOT&PF Emergency Repair Work
DOT&PF is providing updates for each community and has built tools to report damages and request assistance. This page will help you see real-time updates in your community for infrastructure repairs & road access, water & sanitation status, and local recovery progress & resources.
Reporting Damage: If your home, property, or infrastructure was damaged, please report it using our Damage Assessment Hub at: https://damage-assessment-2-akdot.hub.arcgis.com
Need materials or assistance: If your community hasn’t connected with DOT&PF yet, reach out to dot.ask@alaska.gov - we’ll help coordinate approvals and connect you to supplies quickly.
DOT&PF Emergency Response Manager: Amber Shumpert, amber.shumpert@alaska.gov, 907-322-0603.
Water and sewer updates: check Alaska DEC West Coast Storm.
Deering Operations Summary
Completed 11/28. No change until further notice.
11/23/2025
- No Change: Riprap haul to east side of town erosion.
11/21/2025
- No Change: Riprap haul to east side of town erosion.
11/20/2025
- No Change: Riprap haul to east side of town erosion.
11/19/2025
- Riprap haul to east side of town erosion.
11/18/2025
- Riprap haul to east side of town erosion.
11/15/2025
- Borrow haul to erosion site near clinic.
11/14/2025
- Riprap haul to erosion site on east end of town.
11/13/2025
- Riprap haul to erosion site.
11/11/2025
- Continuing to sort rock and develop borrow in pits.
- Shaping slopes, placing gravel and geotextile.
11/10/2025
- Continuing to sort rock and develop borrow in pits.
- Shaping slopes, placing gravel and geotextile.
11/09/2025
- Continuing to sort rock and develop borrow in pits.
- Haul schedule to begin tomorrow.
11/08/2025
- Local quarry operations launched (controlled blasting) to produce riprap/fill.
- Stockpiles created for shoreline armoring and runway embankment reinforcement.
- Placement to begin as weather allows; strong local support for hauling.
- Continuing to sort rock and develop borrow in pits.
- Haul scheduled to begin tomorrow.
11/06/2025
- Blasting for pit development. Excavator sorting riprap.
11/05/2025
- Herc arrived with supplies.
- Blasting at 2pm today.
11/04/2025
- Pit development ongoing.
- Continued trying to get equipment operational.
- Contractor and DOT personnel are moving to new housing.
- Expecting herc with end dump and trailer on Wednesday.
- Blasting tomorrow afternoon.
11/03/2025
- Pit development ongoing.
- Continued trying to get equipment operational.
- Contractor and DOT personnel are moving to new housing.
- Expecting herc with end dump and trailer on Tuesday.
- Blasting tomorrow afternoon.
10/30/2025
- Brice mobilization in progress, fixing local equipment for use. Herc arrived with drill rig and geotextile today.
- Contractor plans to start working the pit this weekend with more equipment arriving Tuesday.
10/26/2025
- Brice mobilizing this weekend.
10/25/2025 - Infrastructure Damage Assessment.
10/16/2025 - Infrastructure Damage Assessment.
11/18/2025
11/14/2025
11/13/2025
11/6/2025
Riprap sorting
11/5/2025
Herc arrived with supplies
11/3/2025
10/30/2025
Herc arrived with drill rig and geotextile today.