Eek Operations Summary

12/3/2025

Daily Activities

  • UICC, DFS and LKSD met regarding repair request to back-up generator. No on-site evaluation has been done yet. LKSD personnel will be getting a picture of the manufacturers plate to UICC so they can research parts/service options. 
  • LKSD mentioned they have a spare generator in Napakiak that could be used to replace the unit if needed. DOT&PF would need to figure out logistics of moving the generator. 

12/2/2025

Daily Activities

  • UICC, DFS and LKSD met regarding repair request to back-up generator. No on-site evaluation has been done yet. LKSD personnel will be getting a picture of the manufacturers plate to UICC so they can research parts/service options. 
  • LKSD mentioned they have a spare generator in Napakiak that could be used to replace the unit if needed. DOT&PF would need to figure out logistics of moving the generator. 

11/29/2025

Daily Activities

  • UICC crew member were on-site 11/22 to inventory materials and plan/prep for LKSD repairs. Looking for LKSD point of contact to connect with. 

11/21/2025

Daily Activities

  • UICC crew member will be on site tomorrow 11/22 to inventory materials and plan/prep for LKSD repairs. Looking for LKSD point of contact to connect with. 

11/15/2025

  • Working on timeline for UICC to be on-site to start repairs. 
  • Electrical repair to teacher housing identified as a need, will coordinate with LKSD on repair efforts. 

11/11/2025

  • (no change) UICC completed comprehensive onsite village damage assessments of Eek. This included a thorough visual inspection of Eek K-12 School in the Lower Kuskokwim School District and the surrounding residential structures. UIC Construction spoke with the school council lead and a member of the tribal council to learn more about the condition of the village and any reported damages.
  • (no change) No reported leaks or water damage was assessed at the school. However, Siding on the southwest side of the building needs repaired.
  • (no change) All damage noted occurred on the West side of Eek which included damage to 6 houses/structures. Damage ranges from broken antenna to missing arctic entrances.

11/10/2025

  • No Change: UICC completed comprehensive onsite village damage assessments of Eek.
    • included a thorough visual inspection of Eek K-12 school in the Lower Kuskokwim School District and the surrounding residential structures.
    • UIC Construction spoke with the school council lead and a member of the tribal council to learn more about the condition of the village and any reported damages.
  • No reported leaks or water damage was assessed at the school; however, siding on the southwest side of the building needs to be repaired.
  • All damage noted occurred on the West side of Eek, which included damage to 6 houses/structures.

11/6/2025

  • UICC reports that they have completed full village assessment.

10/22/2025 - Infrastructure Damage Assessment.


10/19/2025 - Infrastructure Damage Assessment.


10/14/2025 - Infrastructure Damage Assessment.