Norris Bridge Replacement Project Design Public Hearing
Norris Bridge Replacement Project Design Public Hearing
Welcome to the Virginia Department of Transportation's (VDOT) design public hearing for the Norris Bridge Replacement Project. The Norris Bridge Replacement Project will provide a modern, long-term river crossing that meets current design standards, addresses ongoing maintenance needs, supports regional economic growth and improves traffic operations through 2058. The new bridge will be constructed upstream of the existing bridge, which will remain open to traffic throughout construction. The proposed bridge will feature wider shoulders and a higher reinforced concrete safety barrier along each side of the bridge.
Join VDOT for an open house–style public hearing to explore the proposed design plans, talk with the project team and learn more about the project.
Norris Bridge Replacement Project
Design Public Hearing
Each meeting will feature the same information.
Wednesday, Oct. 21, 2026
5-7 p.m
NEW! Lancaster High School
100 Visionary Way
Irvington, VA 22480
Thursday, Oct. 22, 2026
5-7 p.m.
St. Clare Walker Middle School
6814 General Puller Hwy
Locust Hill (Middlesex County), VA 23092
PUBLIC HEARING MATERIALS
- Brochure (PDF Document)
- Display Boards 1 (PDF Document)
- Display Boards 2 (PDF Document)
- Printable Comment Form (PDF Document)
- Newspaper Advertisement (PDF Document)
PROVIDE FEEDBACK
The comment period to be included in the public record for this public hearing closes on Nov. 2, 2026.
- Complete a public opinion survey/comment form online below
- Provide comments orally or in writing at the public hearing
- Submit comments by email to: NorrisBridgeReplacement@VDOT.Virginia.gov.
- Submit comments by mail to:
Norris Bridge Replacement Project
Mr. Beau Hoyt, P.E.
Virginia Department of Transportation
87 Deacon Road
Fredericksburg, VA 22405
NORRIS BRIDGE REPLACEMENT PROJECT MAP
UPC 126805 | State Project: 0003-059-541, P101, R201, C501, B616
Federal Number: STP-059-6(034)