R-5937: Morrattock Road from Long Ridge Road to N.C. 32 South - Plymouth
R-5937: Morrattock Road from Long Ridge Road to N.C. 32 South - Plymouth
The N.C. Department of Transportation proposes to upgrade Morrattock Road from Long Ridge Road to N.C. 32 South near Plymouth in Washington County.
Interactive Study Area Map
Open House Public Meeting
_____________________________________________
November 5, 2026
Roanoke River Maritime Museum
206 W. Water Street
5:00 pm to 7:00 pm
No formal presentation will be made
_____________________________________________
Project Overview
The N.C. Department of Transportation proposes to upgrade Morrattock Road from Long Ridge Road to N.C. 45/N.C. 32 by widening the existing road from two 10-foot lanes with 1-foot paved shoulders to two 12-foot lanes with 5’-0” paved shoulders.
Two new alignment alternatives are being considered to realign the road at the eastern end of Morrattock Road:
- Alternative 1 would realign Morrattock Road to improve the sight distance at the intersection of Morrattock Road and N.C. 45 / N.C. 32.
- Alternative 2 would realign Morrattock Road to align with the intersection of N.C. 32 and N.C. 45 north of existing.
Project Meeting Map Alternative 1
(click image below to enlarge)
Watch this short video for more information about Roundaboutshttps://www.youtube.com/embed/L6uYbj7Gtyo in North Carolina
Please provide any questions or comments about alternative 1 map above.
Please provide any questions or comments regarding alternative 2 map shown above.
Morrattock Road Typical Section
Please provide any questions or comments regarding the typical sections shown above.
Project Funding
| Costs* |
Right-of-Way Acquisition | $ 1.2 Million |
Utilities | $ 0.86 Million |
Construction | $ 19.6 Million |
| Total Cost | $ 21.66 Million |
*Costs are subject to change.
Project Timeline
Milestone | Date* |
| Environmental Document Complete | Spring 2027 |
Right-of-Way Acquisition Begins | Winter 2028 |
Utility Relocation Begins | Winter 2028 |
Construction Begins | Winter 2032 |
* Future dates are subject to change.
Comments:
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit before November 20, 2026.
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: Morrattock-Road-Plymouth@publicinput.com
Phone Number: 984-205-6615 and enter project code 5981
Please provide any questions or comments regarding the proposed project.
Would you like to be added to the project email list?
Project Contact Information
Brooks Braswell
NCDOT Division 1 Project Development Engineer
113 Airport Dr Suite 100
Edenton, NC 27932
Project Contact Information
Tracy Walter, PE
TGS Project Planning Engineer
706 Hillsborough St
Raleigh, NC 27603
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here https://publicinput.com/NCDOT-Title-VI-Form
Resources for Property Owners
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road
project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right
of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of Way Acquisition Process Videos
Page last updated: October 16, 2026
ADA Compliance Checked
Interactive Study Area Map