Murray Force Main Rehabilitation Project Post Construction Survey

Murray Force Main Rehabilitation Project Post Construction Survey

Post-construction survey

About the Project

Haga clic aquí para realizar la encuesta en español

The Murray Force Main Rehabilitation Project is complete. The relined pressurized pipe and the new valves are serving the West Seattle’s neighborhoods. Thank you for your patience and support throughout the construction. 

King County is committed to being a good neighbor. We would like to hear about your experience with this project. Please take a few minutes to provide your feedback. You can respond in the language you prefer. We are not collecting personal data unless you provide it. All entries are optional. Your feedback will help us improve our support for the community.

The survey is open through November 10, 2026. Please share this with friends, neighbors, and others you know who may be interested in this project.

If you like to take the survey by phone or fill out a paper copy, please contact Frances Kuo at 206-263-9237 or mkuo@kingcounty.gov.

Why we did this project

King County relined a section of damaged sewer pipe and installed new valves at the Murray Pump Station. The repairs ensure reliable wastewater service continues for West Seattle residents. It also helps protect public health and Puget Sound.

The Murray Pump Station has two pressurized sewer pipelines, also known as force mains. These pipelines run parallel under Beach Drive Southwest and help move sewage to West Point Treatment Plant. After treatment, the water will be safely returned into Puget Sound.

In March 2022, one of the pressurized pipes broke due to severe corrosion. King County repaired about 800 feet of the damaged pipe at that time. This project repaired the remaining 350 feet of damaged pipe and installed new valves to improve the system.

Map of the Murray Force Main Rehabilitation project area, located on Beach Drive SW, extending from Lowman Beach Park 0.2 miles north.

What did the project do

  • Installed new valves in Murray Pump Station at Lowman Beach Park.
  • Relined a section of the Murray Force Main.
  • Restored street panels in the work area on Beach Drive SW.
  • Installed a new vault and a valve at the north end of the work area.

A construction worker uses a compactor to create a level subgrade surface in a shallow rectangular pit.

Construction crew restored street panels in the work area on Beach Drive SW.

 