Noatak Operations Summary

3/26/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement.

3/25/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/24/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/23/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/22/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/21/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/20/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/17/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/16/26

  • Cruz: Filled super sacks, flooded the rover, and built a base for future super sack placement. 

3/14/26

  • Cruz: Filled super sacks and focused on the south end access connection to the critical area. They started building a base for super sacks placement and flooding the river.

3/13/26

  • Cruz: Filled super sacks and focused on the south end access connection to the critical area. They started building a base for super sacks placement and flooding the river.

3/12/26

  • Cruz: Filled super sacks and focused on the south end access connection to the critical area. They started building a base for super sacks placement and flooding the river. 

3/11/26

  • Cruz: Filled super sacks and focused on the south end access connection to the critical area. 

3/10/26

  • Cruz: Continued to place super sacks closer to the river and built an access point on the south end. Night shift is filling super sacks. 

3/09/26

  • Cruz: Continued to place super sacks to tie in the critical area and north of the critical area. They will start filling bags again tonight. 

3/08/26

  • Cruz: Continued to place super sacks north of the critical area and worked on equipment in the material pit. No bags were filled today. 

3/06/26

  • Cruz: Continued to place super sacks in the critical area and worked on equipment in the material pit. No bags were filled today. 

3/05/26

  • Cruz: Continued to place super sacks in the critical area and worked on equipment in the material pit. No bags were filled today. 

3/03/26

  • Cruz: Dayshift worked on flooding the ice, placing bags in the critical area, and filling the bench area. Nightshift filled the bench area in the critical section and worked on the south section alignment with slope and bottom bench building. 

3/02/26

  • Cruz: Continued to flood the upper north section. Worked on their equipment and placed bags in the south critical area. No bags were filled today. 

 

3/26/26


3/25/26


3/24/26


3/23/26


3/22/26


3/21/26


3/20/26


3/17/26


3/16/26


3/14/26


3/13/26


3/12/26


3/11/26


3/10/26


3/09/26


3/08/26


3/06/26


3/05/26


3/03/26


3/02/26