HB-0021: Replacement of bridge on Oxford Road over Meeting House Branch
HB-0021: Replacement of bridge on Oxford Road over Meeting House Branch
NCDOT is proposing to replace the bridge on Oxford Road over Meeting House Branch.
Interactive Project Study Area Map
This map is for reference only and is a representation of the general project area.
Project Highlights
The N.C.Department of Transportation Highway Division 2 proposes to replace the bridge on Oxford Road over Meeting House Branch in Pitt County. The bridge is owned and maintained by the City of Greenville. NCDOT is completing the design and managing construction of the bridge on behalf of the City of Greenville.
The existing two-lane bridge will be replaced in place with a two-lane structure with room for a future multi-use pathway on the western side. The typical section will include two undivided 11-foot lanes and curb and gutter on both sides.
An off-site detour will be required for the duration of the project. The detour route will use 10th Street, Portertown Road, King George Road, Windsor Road, and Oxford Road. The detour is approximately 4 miles.
Detour Route Map
Click here or on the map image to open the map in a new window for downloading or viewing.
Project Funding
| Estimated Amount* |
Project Development and Design | $ 250,000 |
Property Acquisition | $ 25,000 |
Construction Costs | $ 1,900,000 |
Total Cost | $ 2,175,000 |
* Estimated costs are preliminary and subject to change
Project Timeline
Milestone | Date* |
Environmental Document Completed | August 2023 |
Right of Way Acquisition Begins | September 2023 |
Construction Begins | September 2024 |
* Future dates are preliminary and subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit before July 27, 2023.
The public is encouraged to leave comments using this webspage, email, or phone number:
Email: Oxford-Rd-bridge@PublicInput.com
Phone Number: 984-205-6615 enter project code 6198
Project Contact
Michael Aman, PE
NCDOT Highway Division 2
Division Bridge Program Manager
P.O. Box 1587
Greenville, NC 27834
Project Contact
James Byrd, PE
HNTB
Project Manager
343 E. Six Forks Road, Suite 200
Raleigh, NC 27609
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/NCDOT-Title-VI
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos