Patapsco Regional Greenway: Stoney Run (Phase 3)

Since January, we have been working with the local community and area experts to come up with a design and route for the Patapsco Regional Greenway: Stoney Run Trail! We have considered feedback from...

Patapsco Regional Greenway: Stoney Run (Phase 2)

We are working to design the Patapsco Regional Greenway - Stoney Run Trail! In January, we launched the design process and heard from community members about their ideas for features, concerns about...

Patapsco Regional Greenway: Stoney Run (Phase 1)

In 2017, a plan for the Patapsco Regional Greenway (PRG) was approved by the Baltimore Regional Transportation Board (BRTB). The PRG will be a 40-mile trail running through the Patapsco Valley from Baltimore’s...

Patapsco Regional Greenway: Guinness to Southwest Area Park (Phase 2)

In 2017, the Baltimore Regional Transportation Board (BRTB) approved a plan for the Patapsco Regional Greenway (PRG). The PRG will be a 40-mile trail running through the Patapsco Valley from Baltimore’s...

Patapsco Regional Greenway: Guinness to Southwest Area Park (Phase 1)

In 2017, the Baltimore Regional Transportation Board (BRTB) approved a concept plan for the Patapsco Regional Greenway (PRG), which will be used by bicyclists, walkers, runners and (in some places) wheel...

Patapsco Regional Greenway – Sykesville to McKeldin Preferred Alternative (Phase 2)

The Patapsco Regional Greenway envisions a 40-mile, shared-use trail running through the Patapsco Valley from Baltimore’s Inner Harbor to Sykesville in Carroll County. This trail, when...

Patapsco Regional Greenway – Sykesville to McKeldin Segment (Phase 1)

The Patapsco Regional Greenway envisions a 40-mile, shared-use trail running through the Patapsco Valley from Baltimore’s Inner Harbor to Sykesville in Carroll County. This trail, when...

Patapsco Regional Greenway: Elkridge to Guinness Segment (Phase 2)

The purpose of the project is to develop preliminary design drawings for a segment of the Patapsco Regional Greenway connecting Patapsco Valley State Park, Main Street in Elkridge, and the Guinness Open Gate Brewery. In 2020, the BRTB sought feedback on three options or “alignment alternatives” for the Elkridge to Guinness connection. Based on that feedback, a modified Patapsco Route was selected and in 2021 the BRTB sought public input on future design considerations such as seating, bike racks, educational opportunities along the route, overlooks, pet stations, and signage.

Learn more

 

Patapsco Regional Greenway: Elkridge to Guinness Segment (Phase 1) 

In 2020, the Baltimore Regional Transportation Board (BRTB), as the metropolitan planning organization for the Baltimore region, sought public comments on a new section of the Patapsco Regional Greenway in Howard and Baltimore Counties. The purpose of this project was to provide preliminary design drawings for a 1.2 to 2.5 mile segment of the Patapsco Regional Greenway connecting Patapsco Valley State Park, Main Street in Elkridge, and the Guinness Open Gate Brewery.  The public was offered the chance to weigh in on three possible trail routes, also called alignments. 

Learn more

 

We're building a better region together. Visit the BMC Engagement Hub to get involved in other projects! 

We're building a better region together.

Visit the BMC Engagement Hub to get involved in other projects!