Ladysmith Road at I-95 (Exit 110) STARS Study Alternatives
Ladysmith Road at I-95 (Exit 110) STARS Study Alternatives
This STARS (Strategically Targeted Affordable Roadway Solutions) study is evaluating potential safety and operational improvements along Ladysmith Road (Route 639) between Green Road and Bull Church Road, with a primary focus on the I‑95 interchange. The study examines approximately 0.9 miles of the Ladysmith Road corridor to identify enhancements that improve both intersection and corridor safety and efficiency.
The study area has been identified in the 2023 and 2019 VTrans Mid‑Term Needs assessments as an area where safety and operational needs exist and where potential improvements may be beneficial.
The I‑95 interchange currently experiences several operational and safety challenges, particularly at the ramp terminals. Anticipated residential development west of the study area is also expected to increase traffic demand. This planning‑level STARS study aims to address these issues by identifying potential interim and long‑term solutions.
Earlier in 2025, an online public survey collected input on existing travel conditions in the Ladysmith Road corridor. Respondents highlighted traffic congestion and safety as their top concerns, frequently noting issues such as inadequate sight distance, weaving and merging challenges, and speeding. This feedback helped shape the draft concepts now under evaluation.
Draft improvement concepts will be presented for public comment in April 2026 before the study is finalized. These concepts are planning‑level only; they are not final designs and do not currently have construction funding. The final study report will provide concepts that localities and regional planning agencies may choose to advance through future funding applications.