Skip Navigation

Collins Cove to Willows Resilience Study

Collins Cove to Willows Resilience Study

The project goal is to conduct a resilience study for the Collins Cove to Willows area of Salem, with an emphasis on assessing vulnerability and risk of the study area to coastal and inland flooding. The study focuses on city-owned property including roadway/right-of-way infrastructure, linear parks/bike paths, Collins Cove Park, Collins Cove Beach, Memorial Park, Salem Willows Park, and Winter Island Park.

The project objectives include:

  • Review and apply coastal flooding projections;
  • Examine overland flooding under current and future conditions (including development of a dynamic hydraulic/hydrologic model for the study area);
  • Conduct a stakeholder engagement process to receive and collect feedback on current vulnerabilities and risks and identify recommended measures that the City can implement to increase the resilience of this area to climate change;
  • Develop resilient options for the city parks and road networks in the study area;
  • Develop an emergency response and evacuation plan for residents to use during flood events;
  • Develop a resilient coastal parks toolkit; and
  • Prepare a Collins Cove to Willows Resilience study report that summarizes the findings from the study and includes an implementation plan.

 

***This project is being funded in large part by a Municipal Vulnerability Preparedness (MVP) program Action Grant through the MA Executive Office of Energy and Environmental Affairs***

Step 1

 

Third Community Meeting Recording

This meeting was held as a hybrid meeting on Tuesday, May 23rd  7:00-8:00pm

https://cityofsalem1-my.sharepoint.com/:v:/g/personal/dduhamel_salem_com/EVTFXYndLaxNq00SyDWoA54B4J4pQn8iKDLQbMLqcKWUjQ?e=jFPaLN

Slides for the meeting are included in the documents at the bottom of this page.


Second Community Meeting  Recording

This meeting was held virtually on Monday, February 27th at 7PM, a link to the recording is posted below.

https://cityofsalem1-my.sharepoint.com/:v:/g/personal/dduhamel_salem_com/ERGPjgzxcLRFtwj4KQxRHBUBC6JrwzN5npOYeSTgw4bjcw?e=iQPMlD

Slides for the meeting are included in the documents at the bottom of this page.

The poll questions from this webinar have been included below on this Public Input page - we'd love your feedback!

 

Also, here is a link to a video of the Salem Sound Coastwatch presentation with Woods Hole Group about the Massachusetts Coast Flood Risk Model (MC-FRM) in case you'd like more information on that model

https://vimeo.com/473592435


Slides from the first public community meeting (Nov 29th) are included in the documents below.

And here is a link to Salem Access TV's recording of the presentation given at the first public community meeting:

https://www.youtube.com/watch?v=CPHtVV-YMjQ

(or scroll down on this page to play the video)

 

 

Which neighborhood are you from?

Click to view results

Do you think the present-day coastal driven flooding shown by this model is consistent with your general experience?

Click to view results

Do you think the present-day rainfall driven flooding shown by this model is consistent with your general experience?

Click to view results

How do you use the public spaces in the project area? What functionality do you not want to lose as a result of projected flooding or proposed adaptation measures?

Click to view results

What resilience options do you like and are interested in seeing in the project area?

Click to view results

What resilience issue is most important to you?

Click to view results

Which option would you prefer for the Workshop #3, to be held in May?

Click to view results

Requesting/welcoming - ideas, concerns, stories, experiences, photos, etc.
(if including a photo, please provide date photo was taken if possible)