US-1 (Washington Highway) AMP Study in Hanover County
US-1 (Washington Highway) AMP Study in Hanover County
Study Background:
Arterial Management Plans (AMPs) are a key component of the Arterial Preservation Program, providing localities and VDOT a plan for infrastructure that supports future land use and development.
The purpose of the U.S. 1 (Washington Highway) AMP is to identify safety, operational, and access management needs between the Henrico/Hanover County Line and Elletts Crossing Road at the northern limits of the Town of Ashland.
The study will establish a corridor management plan to guide incremental improvements and develop targeted, cost-effective investment strategies that address current and future transportation needs. The recommendations from the study will result in application-ready materials that can be used by Hanover County and the Town of Ashland for future funding opportunities.
Existing Conditions:
The study area begins at the Henrico/Hanover County Line and spans approximately 7.5 miles to Elletts Crossing Road at the northern limits of the Town of Ashland. The speed limit along the corridor varies between 35 and 45 miles per hour (mph). The corridor functions as a critical north-south arterial, supporting regional mobility, local access, and economic development. The corridor also serves as an alternative route to Interstate 95 (I-95).
Ongoing development, changing land use patterns, fluctuating travel demand, and many closely spaced intersections present challenges along the corridor. The study area also includes downtown Ashland, between College Avenue and Berkley Street, and is near the northern terminus of the Fall Line Trail.
These challenges require close coordination with Hanover County and the Town of Ashland to ensure the unique needs of the corridor are adequately addressed.
Corridor Needs:
Safety has been identified as the number one priority for the study area. Between 2021 and 2025, there were two fatal crashes and 17 severe injury crashes along the corridor. The study will also look to improve access management and congestion issues. The study area is currently served by the GRTC LINK Microtransit Ashland Zone and is near the alignment of the Fall Line Trail.
Which of the following safety issues concern you? (Check all that apply)
Rank what is the most important issue to you along the study area.
Drag your top items in order of importance.