SR-113 | Main Street & 400 E. | Midway | Improved
SR-113 | Main Street & 400 E. | Midway | Improved
SR-113 at 400 East(River Road) in Midway by installing a four-way signal with dedicated turn lanes, pedestrian access with crosswalks, and bike lanes.
Overview
Project Overview
We are improving SR-113 at 400 East (River Road) in Midway by installing a four-way signal with dedicated turn lanes, pedestrian access with crosswalks, and bike lanes. These changes aim to streamline traffic, reduce delays, and make the intersection safer for motorists and active transportation users.
Key Features of the Project Include:
• New four-way traffic signal at SR-113 and 400 East (River Road)
• Dedicated turn lanes to improve traffic flow
• Pedestrian access improvements with marked crosswalks
• New bike lanes to support active transportation users
Construction Impacts:
Motorists can expect to be shifted into open lanes as necessary. Be prepared to stop for one-way traffic-light operations. There may also be full closures along 400 East (River Road) at times; detour routes will be posted. Please anticipate light delays between 5–10 minutes. Alternate pedestrian access will be available during construction. Some light to moderate noise from equipment can be expected. Two-way travel will remain in place during non-working hours and holidays.
**One-way alternating traffic will be in place on Midway Main Street between 300 East and 500 East from early March through mid-May. During this time, access at the intersections of 400 East and/or 500 East with Main Street will be closed during daylight hours. In addition, from April 22 through May 1, 2026, the intersection at 500 East and Main Street will be fully closed. Drivers are advised to use caution when traveling through the area, follow posted traffic control, and slow down for crews.
SR-113 / River Road Construction Area Map
Contact Information
To contact the public information team with questions or concerns:
Stay Informed
To receive email updates, please fill out the form at the very end of the Overview tab or email the public information team at MidwayMain400E@utah.gov and type "Updates" in the subject line.
**You are signing up for updates from all Heber Valley projects.
Active Construction
Hours: Mostly Daytime work
Workdays: Monday - Friday
No work on Sundays or holidays (Saturdays only as necessary)
Schedules are subject to change due to weather conditions and material availability.