Hooper Bay: DOT&PF Emergency Repair Work
Hooper Bay: DOT&PF Emergency Repair Work
DOT&PF is providing updates for each community and has built tools to report damages and request assistance. This page will help you see real-time updates in your community for infrastructure repairs & road access, water & sanitation status, and local recovery progress & resources.
Reporting Damage: If your home, property, or infrastructure was damaged, please report it using our Damage Assessment Hub at: https://damage-assessment-2-akdot.hub.arcgis.com
Need materials or assistance: If your community hasn’t connected with DOT&PF yet, reach out to dot.ask@alaska.gov - we’ll help coordinate approvals and connect you to supplies quickly.
DOT&PF Emergency Response Manager: Amber Shumpert, amber.shumpert@alaska.gov, 907-322-0603.
Water and sewer updates: check Alaska DEC West Coast Storm.
Hooper Bay Operations Summary
Completed 11/25. No change until further notice.
11/25/2025
- Horizontal work complete.
11/23/2025
- Lumber arrived and boardwalk repairs are underway.
11/21/2025
- Awaiting 2x6 lumber to complete boardwalk repairs.
- Sheet pile cap repairs complete.
11/20/2025
- Awaiting 2x6 lumber to complete boardwalk repairs.
- Continuing sheet pile cap repairs.
11/19/2025
- Awaiting 2x6 lumber to complete boardwalk repairs.
- Continuing sheet pile cap repairs.
- Tight blade grading on airport access road.
11/18/2025
- Clearing windblown snow away.
- Waiting on additional lumber and hardware to continue boardwalk handrail repairs.
11/15/2025
- No Change: Gathering riprap to reinstall for sheet pile protection.
- Boardwalk repairs are underway.
11/14/2025
- Gathering riprap to reinstall for sheet pile protection.
11/13/2025
- Moving lumber from south of airport to the north end of town for boardwalk repairs.
- Pioneered access road to rebuild slopes against the sheet piles.
11/11/2025
- No Change: Boardwalk repairs will begin Wednesday, 11/12.
11/10/2025
- No Change: Boardwalk repairs will begin Wednesday, November 12.
- Qayaq continues to fill and restore road by the airport runway.
11/09/2025
- Boardwalk repairs will begin Wednesday, November 12.
- Qayaq continues to fill and restore road by the airport runway.
11/08/2025
- Boardwalk repairs will begin Tuesday, November 11th.
11/07/2025
- Boardwalk repair mobilization underway; Qayaq Construction to start over the weekend.
- Materials pre-staged (lumber, pilings, hardware).
- Plan: re-anchor lifted sections, replace planks, drive new piles—prioritizing routes to school/clinic/airport.
11/06/2025
- Qayaq subcontractor will be onsite this weekend for boardwalk repairs.
11/05/2025
- Mechanic flying out this weekend to get equipment operational.
11/04/2025
- Mechanic flying out this weekend to get equipment operational.
11/03/2025
- No change: initial site assessment complete.
10/24/2025
- Infrastructure Damage Assessment.
10/15/2025
- Infrastructure Damage Assessment.
10/09/2025
- Infrastructure Damage Assessment.
11/23/2025
11/20/2025
11/19/2025
11/14/2025
11/13/2025