Presently, the walkway under the bridge is too narrow and has little to no site distance that makes it unsafe for walkers and cyclists. Also, the grade on the walkway is too low so when there is a rain event water from the creek overflows onto the walkway. If these things could be alleviated, it would be great.
The bridge drips from the concrete above. The walkway underneath has a steep incline. It'd be great to have it lowered a bit. There should be easier access to the walkway for both bikers and walkers from the top of the bridge.
Easing access for walkers & bikers from bridge to the trail, improving safety for walkers & bikers (adding a sidewalk to the bridge), protecting wildlife & ecosystem of the creek during the process.
Yes, How do we access Shelly Lake and north during construction? This area is used as part of a loop from Raleigh up to the Falls Dam and down the Neuse and back to Raleigh.