Zilker Park Vision Plan Community Survey #5

Survey open February 15 through April 11, 2023
Move Filter by Segment Options
Project Engagement
Views 7,941
Participants 708
Responses 11,408
Comments 858
Move Filter by Segment Options
How well does each option achieve the overall guiding principles and goals?

Loading Data...
Move Toggle Comments Filter by Segment Options
Select the top 5 elements you like from Plan Concept A: Stitch?
  • 29174%1. Land Bridge
  • 24662%9. Additional pedestrian/bike bridge connections across Barton Creek
  • 20752%6. Pedestrian bridge at Toomey Road extension
  • 18547%7. Barton Springs Road (2 lanes of traffic, no on-street parking)
  • 16442%3. Removal of vehicular traffic from Lou Neff
  • 15840%5. Ecological uplift of Butler Landfill with some surface lot parking
  • 9825%8. Off leash dog area in Polo Field lawn area
  • 7719%11. Stratford Drive realignment east of MoPac and closure of existing Stratford alignment to vehicular traffic
  • 6717%10. New location of Zilker Hillside Theater (Great Lawn area)
  • 3910%2. Sports complex at rugby field
  • 3910%4. Disconnection of Columbus Drive
  • 144%Other
395 Respondents
Move Filter by Segment Options
What is missing that you think would improve Plan Concept A?
Loading Comments
Move Toggle Comments Filter by Segment Options
Select the top 5 elements you like from Plan Concept B: Edges?

Loading Data...
Move Filter by Segment Options
What is missing that you think would improve Plan Concept B?
Loading Comments
Move Toggle Comments Filter by Segment Options
Select the top 5 elements you like from Plan Concept C: Regenerate?
  • 19555%2. Boardwalk on Lady Bird Lake
  • 18953%11. Improved access points into water at Barton Creek (outside of Barton Springs Pool)
  • 17549%8. Ecological uplift of Butler Landfill (meadow with some tree planting)
  • 15744%4. Lou Neff Point pedestrian and bike bridge
  • 15644%3. Separated bike trail from Butler Hike-and-Bike Trail along Lady Bird Lake
  • 10329%1. Repurposed Caretaker's Cottage and Quonset Hut to welcome center
  • 9426%9. Surface parking lots, no parking garages
  • 8524%10. Azie Morton Road improvements
  • 5816%5. Boat House and dock moved to east side of MoPac near Butler Landfill
  • 5716%6. Barton Springs Road improvements (one lane of travel in each direction, on-street parking)
  • 5515%7. Stratford Road remains in current alignment, open to vehicular traffic
  • 93%Other
355 Respondents
Loading more report objects...